My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150168 Letter of Substaintial Completion
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150168 Letter of Substaintial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:26:08 AM
Creation date
4/3/2007 8:27:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150168
Contractor Name
Fulton Irrigation Ditch Company
Contract Type
Loan
Water District
1
County
Adams
Bill Number
SPL
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone:~03)8~3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />September 20, 2004 <br /> <br />Bill Owens <br />Governor <br /> <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT SCHEDULE <br /> <br />Russell George <br />Executive Director <br /> <br />Mr. Brice Steele, Secretary <br />Fulton Inigating Ditch Company <br />25 South Fourth Avenue <br />Brighton, CO 80601-2029 <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Re: Contract Number C150168 - Diversion Structure Rehabilitation <br /> <br />Dear Mr. Steele: <br /> <br />This letter is to advise you that the work descnbed in the above referenced Contract was substantially completed as of <br />September 1, 2004. <br /> <br />In accordance with the Contract, the Fulton Inigation Ditch Company owes $795.51 for interest during construction, as <br />calculated on the attached spreadsheet, due by October 4,2004. Make your check payable to the Colorado Water Conservation <br />Board and include the loan contract number on the check. <br /> <br />As outlined in the Promissory Note, Appendix 2 of Contract, your first loan payment in the amount of 11,328.59 is due <br />on September 1, 2005. Please see the attached Loan Repayment Schedule and a copy of the Promissory Note. A 1% loan <br />origination fee of$1,700.00 has been added to your principal balance for a final loan balance of$171,700.00 <br /> <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br /> <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Fulton Inigating Ditch Company on <br />the successful completion of this project. Please call if you have any questions regarding this matter or if we can be of service to <br />you in the future. <br /> <br />Sincerely, <br /> <br />~J~ <br /> <br /> <br />Chief, Water Supply Planning and Finance Section <br /> <br />cc. <br /> <br />Eric Wilkinson, CWCB Board Member <br />DNR Accounting <br />Water Supply Planning and Finance Section <br />Project file <br />Contract file <br />Accounts Receivable <br /> <br />Contract C150168 <br />Expended Amount <br /> <br />= $171,700.00 <br />= $171,700.00 <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.