My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000513
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000513
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:25 AM
Creation date
4/3/2007 8:27:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150151
Contractor Name
Windsor Reservoir and Canal Company
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.\ <br />,) <br /> <br />PROMISSORY NOTE <br /> <br />Date: October 1, 2003 <br />Borrower: The Windsor Reservoir & Canal Company <br />Principal Amount: $681,750 <br />Interest Rate: 2.5% per annum <br />Term of Repayment: 30 years <br />Loan Contract No.: C150151, dated October 1,2003 <br /> <br />Loan Payment: <br />Payment Initiation Date*: <br />Maturity Date*: <br /> <br />$32,572.41 <br />fi1ar-c~ /. ZooS <br />, <br /> <br />. Jl}1 Cltr-cJ1. J. Z 0 .3 r <br />/ <br /> <br />* These two fields are filled in after the project has been substantially completed. <br /> <br />1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water Conservation <br />Board ("CWCB"), the Principal Amount plus Interest for the Term of Repayment, pursuant to <br />the LOAN CONTRACT and this Promissory Note. <br /> <br />2. Principal and interest shall be payable in equal Loan Payments, with the first payment due and <br />payable one year from the date the CWCB determines that the project is substantially <br />complete (Payment Initiation Date), and annually thereafter until all principal, interest, and late <br />charges, if any, have been paid in full, with all such principal, interest, and late charges, <br />required to be paid on or before the Maturity Date. <br /> <br />3. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman Street, <br />Room 721, Denver, Colorado 80203. <br /> <br />4. The CWCB may impose a late charge in the amount of 5% of the annual payment if the <br />CWCB does not receive the annual. payment Within 15 calendar days of the due date. <br /> <br />5. This Note may be prepaid in whole or in part at any time without premium or penalty. Any <br />partial prepayment shall not postpone the due date of any subsequent payments or change <br />the amount of such payments. <br /> <br />6. All payments received shall be applied first to late charges,if any, next to accrued interest and <br />then to reduce the principal amount. <br /> <br />7. This Note is issued pursuant to the LOAN CONTRACT between the CWCB and the BORROWER. <br />The LOAN CONTRACT creates security interests in favor of the CWCB to secure the prompt <br />payment of all amounts that may become due hereunder. Said security interests are <br />evidenced by a Security Agreement(s), Deed(s) of Trust, and/or Assignmemt(s) of even date <br />and amount and cover certain revenues, real property, water rights and/or accounts of the <br />BORROWER. The LOAN CONTRACT, Security Agreement, Deed of Trust, and/or Assignment <br />grant additional rights to the CWCB, including the right to accelerate the maturity of this Note <br />in certain events. <br /> <br />Appendix 2 to Loan Contract C150151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.