My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150171 Letter of Stubstaintial Completion
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150171 Letter of Stubstaintial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2012 9:06:03 AM
Creation date
4/3/2007 8:27:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150171
Contractor Name
Terrace Irrigation Company, The
Contract Type
Loan
Water District
0
County
Conejos
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PROMISSORY NOTE <br /> <br />Date: April 1, 2004 <br />Borrower: TheTerrace Irrigation Company <br />Principal Amount: $245,430.00 <br />Interest Rate: 2.5% per annum ' <br /> <br />Term of Repayment: <br /> <br />Loan Contract No.: <br /> <br />Loan Payment: <br /> <br />Payment Initiation Date*: <br /> <br />Maturity Date*: <br /> <br />* Payment Initiation Date <br />substantially completed. <br /> <br />1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water Conservation Board <br />("CWCB"), the Principal Amount plus Interest for the Term of Repayment, pursuant to the LOAN <br />CONTRACT and this promissory note. <br /> <br />30 years <br />C150171, dated April 1, 2004 <br />$11,726.07 <br />,J 4-h IA.-4 ~ 7 I.' Zoo ~ <br />,.J &c. 11. ""~,. J 1/ Z () .35' <br />and Maturity Date fields are filled <br /> <br />in after the project has been <br /> <br />2., Principal and interest shall be payable in equal Loan Payments, with the first payment due and <br />payable one year from Payment Initiation Date (the date the CWCS determines that the project <br />is substantially complete), and annually thereafter. All principal, interest, and late charges, if <br />any, then remaining unpaid shall be due and payable on or before the Maturity Date. <br /> <br />3. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman Street, <br />Room 721, Denver, Colorado 80203. .. <br /> <br />4. The eWCB may impose a late charge in the amount of 5% of the annual payment if the CWCB <br />does not receive the annual payment within 15 calendar days of the due date. <br /> <br />5. This Note may be prepaid in whole or in part at any time without premium or penalty. Any <br />partial prepayment shall not postpone the due date of any subsequent payments or change the <br />amount of such payments. <br /> <br />6. All payments received shall be applied first to late charges, if any, next to accrued interest and <br />then to reduce the principal amount. <br /> <br />7. This Note is issued pursuant to the LOAN CONTRACT between the CWCB and the BORROWER. <br />The LOAN CONTRACT creates security interests in favor of the CWCB to secure the prompt <br />payment of all amounts that may become due hereunder. Said security interests are evidenced <br />by a Security Agreement and/or Deed of Trust ("Security Instruments") of even date and <br />amount and cover certain revenues and/or real property of the BORROWER. The LOAN <br />CONTRACT and Security Instruments grant additional rights to the CWCB, including the right to <br />accelerate the maturity of this Note in certain events. <br /> <br />8. If any annual payment is not paid when due or any default under the LOAN CONTRACT or the <br />Security Instruments securing this Note occurs, the CWCB may declare the entire outstanding <br /> <br />Appendix 2 to Loan Contract C150171 <br />
The URL can be used to link to this page
Your browser does not support the video tag.