My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153770 Letter of Substaintial Completion
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153770 Letter of Substaintial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 1:54:16 PM
Creation date
4/3/2007 8:26:45 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153770
Contractor Name
Summit Reservoir and Irrigation Company
Contract Type
Loan
Water District
34
County
Montezuma
Bill Number
SB 97-008
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />August 17, 2006 Bill Owens <br />Governor <br /> <br />Russell George <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Mr. David Sanford, Secretary <br />Summit Reservoir and Irrigation Company <br />P.O. Box 127 <br />Dolores, CO 81323 <br /> <br />Dan McAullife <br />Deputy Director <br /> <br />Re: Contract Number C153770 - Ditch System Rehabilitation <br /> <br />Dear Mr. Sanford: <br /> <br />This letter is to advise you that the work described ill the above referenced Contract was <br />substantially completed as of August 1, 2006. <br /> <br />In accordance with the Contract, the Summit Reservoir and Irrigation Company owes $43,770.25 <br />for interest during construction, as calculated on the attached spreadsheet, due on September 1, 2006. <br />Make your check payable to the Colorado Water Conservation Board and include the loan contract number <br />on the check. <br /> <br />As outlined in the Promissory Note, Appendix 2 of Contract, your first loan payment in the amount <br />of $16,826.29 is due on August 1, 2007. Please see the attached Loan Repayment Schedule and a copy of <br />the Promissory Note. <br /> <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, <br />please note that the renewed insurance certificates need to be provided to the Colorado Water Conservation <br />Board annually. <br /> <br />Your original loan authorization approved by the Colorado Water Conservation Board was for <br />$600,000. The actual loan amount was revised to $200,000, during the contract process, and then was <br />increased to $300,000 during construction of the project. To properly close out your loan and to complete <br />our files, please provide us with a letter stating that the Summit Reservoir and Irrigation Company does not <br />intend to utilize the remaining $300,000 approved by the Colorado Water Conservation Board. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Plahning <br />
The URL can be used to link to this page
Your browser does not support the video tag.