My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01843
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01843
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
4/2/2007 3:06:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150028
Contractor Name
Colorado Division of Wildlife
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />. <br /> <br />. <br /> <br />e <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />721 CcntenniJI Building <br />1313 Sherrl1JI1 Street <br />Denver, COior,ldo B0203 <br />Phone: UOJ) 1J6fJ-3441 <br />fAX: (jD:I) 866-4474 <br /> <br />STATE OF COLOMDO <br /> <br />. <br /> <br />Roy Ron"" <br />Cl)VefllOI <br /> <br />MEMORANDUM <br /> <br />lome, S. lochheod <br />Executive Drrector, DNI{ <br /> <br />D;Hi~; C. lite, PE. <br />Dirl'ctor, eWeR <br /> <br />TO: Colorado Water Conservation Board Members <br /> <br />FROM: Peter Evans.y::.... <br />Bill Stanto~~};' <br />Bill Green p <br /> <br />DATE: September 19, 1997 <br /> <br />SUBJECT: Agenda Item 21.a., September 22-23, 1997 Board Meeting. <br />Water Project Construction Loan Program - Informational Items. <br />CWCBlDivision of Wildlife - Native Aquatic Species Facility MOU <br /> <br />Background <br /> <br />In November 1996, the CWCB and the Colorado Wildlife Commission approved a joint <br />resolution for the development and maintenance of a Native Aquatic Species Facility <br />(NASF). In the 1997 Construction Fund bill, the General Assembly approved the grant of <br />up to $2.0 million recommended by the CWCB on the condition that the Colorado <br />Division of Wildlife (CDOW) submit a detailed proposal for the facility to include cost <br />sharing arrangements for capital and operating costs and an opportunity to review all <br />appraisals for the property to be acquired for the NASF <br /> <br />CWCB and CDOW staff members have met twice in the last month and -a- half to <br />discuss the acquisition of the property, the development of a Comprehensive Planning <br />Description, associated feasibility work for the facility and a memorandum of <br />understanding (MOD) for the project between the two agencies. An option contract on the <br />proposed site near Alamosa has been submitted by CDOW to the owner of the property. <br /> <br />Feasibility Study and Comprehensive Planning Description <br /> <br />CD OW staff is in the process of preparing a response on several feasibility questions <br />submitted by CWCB staff. This response, together with reports previously done for <br />CDOW, will constitute the feasibility study for the project. CDOW is also preparing a <br />comprehensive planning description which should help establish the role of the NASF <br />within the larger process of: <br />
The URL can be used to link to this page
Your browser does not support the video tag.