My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01843
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01843
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
4/2/2007 3:06:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150028
Contractor Name
Colorado Division of Wildlife
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />. Within one year of the date of the MOD, the CDOW will prepare a comprehensive <br />plan which will describe the process by which CDOW will identify declining species <br />and develop priorities for habitat improvement and the role of the NASF in species <br />recovery. CDOW will make the Comprehensive Plan available for public review and <br />comment prior to adoption. <br /> <br />. CDOW, the design engineer, and/or the construction contractor will be responsible <br />for obtaining all necessary federal, state and local approvals and permits for <br />construction and operation of the facility. <br /> <br />Selection of Desi2n En2ineer <br />CWCB and CDOW staffs met in late February and selected the firm of FishPro of Port <br />Orchard, Washington as the design engineer for the project. FishPro prepared the 1993 <br />conceptual design report for the NASF. It is expected that the consultant will be under <br />contract and working by May 1, 1998 and that all design work will be completed by April <br />1999. Construction is expected to begin shortly thereafter. <br /> <br />Recommendation <br />Staff recommends that the Board authorize the Acting Director to sign the attached draft <br />MOD at such time as all feasibility investigations by CWCB and CDOW staffs have been <br />completed and final issues identified above have been resolved to his satisfaction. <br /> <br />e Attachment <br /> <br />cc: Eddie Kochman, CDOW <br />Eric Hughes, CDOW <br />Linda Bassi, AGO <br /> <br />e <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.