Laserfiche WebLink
<br />CWCB Construction Fund Loan Application <br />Revised January 31, 1994 <br /> <br />4. Is the organization incorporated in the State of Colorado? YES ~ NO_ <br />(If "YES", please include a copy of the articles of incorporation, and the Bylaws with <br />this application form.) (in mail) <br /> <br />5. Please provide a brief description of the owner's existing water supply facilities and <br />describe any existing operational or maintenance problems. (Attach separate sheets and <br />a map, if needed.): <br />Water facilities currently consist of five (5) municipal water wells and two <br /> <br />(2) one-million-gallon storage tanks. The only type of treatment is chlorination <br />which takes place at the water wells. Operational problems include decreasing <br />water production from wells due to dropping water table and high leakage within <br />water distribution system. <br />6. For existing facilities indicate: (a) the number of shareholders , or <br />(b) the nu~ber of customers served 1500 . QCU)Vl\-Cs <br />"000 Pe-of te.- <br /> <br />Part B. - Description of the Project <br /> <br />1. <br /> <br />Name of the project or facility: <br /> <br />New municipal and irrigation water wells <br /> <br />2. What is the purpose of this loan application? Check one. <br /> <br />~ New project <br />_ Rehabilitation or replacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency Repair <br />_ Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under <br />a storage restriction order from the State Engineer? YES NO <br /> <br />2 <br />