My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01839
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01839
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
4/2/2007 3:05:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0061FX
Contractor Name
Craig, City of
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />..- <br /> <br />Better cost estimates will be developed during the engineering study. <br /> <br />As with all City debt, the City will budget and repay CWCB debt as scheduled before any other liabilities <br />are paid. If necessary, water user fees can be increased to supplement money available for debt service. <br /> <br />The City believes this situation to be a serious one and, if necessary, we can submit an application for an <br />emergency project, since these wells are required to ensure our community has a reliable drinking water <br />supply and are required to provide adequate emergency fire flows. <br /> <br />If you have any questions, please call. We will attempt to have the engineering study on this project <br />completed as soon as possible. <br /> <br />'" <br /> <br />Sincerely, <br />CITY OF FORT LUPTON, COLORADO <br /> <br />~.," ~ 1, /d.v.- "'7'r <br /> <br />Bernadette Kimmey \J <br />Finance Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.