Laserfiche WebLink
<br />,1\ <br />.' <br /> <br />Implementation Program. Annual costs ranged from $85/ac-ft at 2% <br />interest to $270/ac-ft at 10% interest. Further investigation of <br />this sized reservoir could be conducted in a Phase II study. <br /> <br /> <br /> 300 <br /> 250 <br />" <br />... <br />v <br />... 200 <br />u. <br />, <br />u <br />.. <br />... <br />Vl <br />8 150 <br />..J <br />.. <br />~ <br />z <br />.. <br /> <br />'00 <br /> <br />so <br /> <br />OWENS CREEK <br />sPONSORS' COST/AC-FT (10,000 Bc-ft "BPBClty) <br /> <br />6 <br />ANNUAL I NTEREST RATE (~) <br /> <br />10 <br /> <br />___5oon50,..6. Yield:, 7000 llc-ft <br /> <br />No ~11.1I1 toet IT 5tor"IlIQ1e Alloeotec:l l~ EnaClno-r-~ Fi.n <br /> <br />Figure 3 10,000 ac-ft Reservoir, Annual Cost vs Interest <br />Rates, Fifty Year Repayment Period. $18.9 Million Total Cost. <br /> <br />Figure 4 depicts the overall capital cost vs total storage <br />capacity for reservoir sizes between 8,900 ac-ft and 32,000 ac-ft <br />(total volume) utilizing alternative unit costs. The incremental <br />cost differential between different sized reservoirs is <br />approximately $1000 per acre-foot. <br /> <br /> CAPACITY VS TOTAL CAP I TAL COST <br /> ., <br /> 00 <br /> '" ., <br /> ~ <br /> 8 <br /> ~ <br /> n .. <br /> " <br /> u <br /> " <br /> (; '" <br /> ... <br /> '" <br /> " <br /> .. ., .. <br /> CZIOllc'ty ('000 A<:-F\) <br />Figure 4 Capital Cost (with alternative unit costs) vs Total <br />capacity <br /> <br /> <br /> <br />10 <br />