My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01836
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:49 AM
Creation date
4/2/2007 3:05:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153788
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
3
County
Weld
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />.. <br /> <br />5. Please indicate: The number of shareholders: <br />or <br />The number of customers: <br /> <br />approximRtply 1(,0 <br /> <br />SRmp <br /> <br />6. What is the purpose of this project? Check one: <br />_ New project <br />---X. Rchabilitation or rcplacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency repair <br />_ Other (please describe) <br /> <br />7. If thc project is for rehabilitation of an existing dam, is the dam currently under a <br />restriction by the State Engineer? NO <br /> <br />8. General location of the proposed project. Include county and approximate di-stance and <br />direction from the nearest town or city: Project is lOC'Rtpo in T .Rrimer County within <br />the City of Loveland or within three miles of thp City of T mTe hmrl <br /> <br />9. Please provide a brief narrative description of the proposed project including purpose, <br />facilities, types of water use to be served, and service area (if known at this time). Attach <br />additional pages, maps, or drawings as needed. <br />See attached summary sheets and map <br /> <br />Proposed project is to rehabilitatp spvprRl RrPR~ ~n0 st~lctures tvithin th€ <br />total water supply system of the Company <br /> <br />10. Please list any preliminary analyses or investigations which have been done or are in <br />progress for the proposed project along with the names of the persons or firms who prepared <br />the analyses: Feasibility Study to be prepared by ECl, 5660 Greenwood Pl::l7.::l Rlvrl., <br />Suite 500, Englewood, Colorado - Mr. Ed Thorns <br /> <br />II. If preliminary cost estimates have been made, indicate the estimated cost of the project:_ <br />None to date <br /> <br />12. Are you intending to apply for a feasibility study loan from the CWCB Construction <br />Fund? yes <br /> <br />~~::::~"!::.2 ) <br />~ >d<'~/~, <br /> <br />I h~ /tlT <br /> <br />Date <br /> <br />1 :\wctrans\sec b\prca pp ,mis <br />
The URL can be used to link to this page
Your browser does not support the video tag.