Laserfiche WebLink
<br />.--...~:' <br /> <br />.. <br /> <br />.... rr- <br /> <br />5. Please indicate: The number of shareholders: 141 <br />ill <br />The number of customers: <br /> <br />6. What is the purpose of this project? Check one: <br />_ New projeet <br />~ Rehabilitation or replacement of existing faeility <br />_ Enlargement of existing facility <br />_ Emergency repair <br />_ Other (please deseribe) <br /> <br />7. If the project is for rehabilitation of an existing dam, is the dam currently under a <br />restrietion by the State Engineer? __Yes <br /> <br />8. General location of the proposed project. Include county and approximate di'stanee and <br />direction from the nearest town or city: The dan ;~ lon8tAcl in C,)~b:rr' r.o;mty <br />appro.imately 6 miles north of Westcliff. Colo. <br /> <br />9. Please provide a brief narrative description of the proposed project including purpose, <br />facilities, types of water use to be served, and service area (if known at this time). Attach <br />additional pages, maps, or drawings as needed. <br />The concrete d~~ is currently under restriction by the State Engineer. <br />If the top 12 ft. is removed and then replaced by ne~1 concrete"b}T 1999, <br />the State will remove the restrictjon. RAn8i~ i~ l;~,jten to the dam. <br />The water involved is used for irri~ation and recreation The vice <br />area 18 1n De incoln Park area of Canon ity, Colo. Additional <br />i-8f~f~~ ~~t~yr~1Srmin~dan1ry~~?~v~~aito1ffi:1J1neH-1\a~Pb~n8rlbbB:io} \~inReport. <br /> <br />progress for the proposed project along with the names of the persons or firms who prepared <br />the analyses: An '. tnvA!'\+'i g~ t:j "Ire RApOX't: en" a Fes Sl ibili ty Report ho. ...?O <br />been completed b}T GEl Consultants Inc. located in Eng1Awnod, Colo. <br /> <br />11. If preliminary cost estimates have been made, indicate the estimated cost of the project:_ <br /> <br />A total proj€ct cost of $840,000 is sho~hl for congtruction cost <br />irri 1999. <br />12. Are you intending to apply for a feasibility study loan from the CWCB Construction <br />Fund? no. Feasi bility has been finished in 1991. <br /> <br />~P:~ <br />/'Signature <br />/Y&'JI t/ ~ It> /' ../)t! ~i!$ C!. - /)ye. <br />:P ,../~ a. ~ Ifl!.-(t' y{/t:J (V' {]e:;,. <br /> <br />S"-2B- 97 <br />Date <br /> <br />1 :\wctrans\sec b\preapp.mis <br />