Laserfiche WebLink
<br />... ,. .. <br /> <br />The scope of work does not include: <br /> <br />. New or revised hydrologic evaluations or related meetings with the OSE (this task is <br />viewed as complete). <br /> <br />. Preparation of a formal, current "Emergency Action Plan" (this task must be <br />completed to meet OSE requirements, but is not included in the current preliminary <br />engineering evaluation). <br /> <br />. Geotechnical inspection (will rely upon geotechnical evaluations completed by USSR <br />and Woodward-Clyde Consultants within last five years). <br /> <br />. Surveying current positions of surface movement devices (you may wish to have this <br />performed separately by P. Epp or another local surveyor). <br /> <br />. Rental of a P-M "Snooper" or similar vehiCle mounted inspection piatform to view the <br />underside of the existing bridge (expected to be necessary if similar equipment is not <br />available through Craig or on loan from COOT to Craig.) <br /> <br />. Overall project management including purchase agreement re-negotiation, public <br />meetings, funding assistance, etc., which is not directly technically oriented. <br /> <br />. Permitting, topographic or land survey, design of facilities or other final design stage <br />activity. <br /> <br />. Generating any documentation which might specifically be subsequently needed by <br />any third party financing, regulatory, etc., agency. <br /> <br />. Any fish exclusion facilities evaluation. <br />