My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01825
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
4/2/2007 3:05:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0061FX
Contractor Name
Craig, City of
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... ,. .. <br /> <br />The scope of work does not include: <br /> <br />. New or revised hydrologic evaluations or related meetings with the OSE (this task is <br />viewed as complete). <br /> <br />. Preparation of a formal, current "Emergency Action Plan" (this task must be <br />completed to meet OSE requirements, but is not included in the current preliminary <br />engineering evaluation). <br /> <br />. Geotechnical inspection (will rely upon geotechnical evaluations completed by USSR <br />and Woodward-Clyde Consultants within last five years). <br /> <br />. Surveying current positions of surface movement devices (you may wish to have this <br />performed separately by P. Epp or another local surveyor). <br /> <br />. Rental of a P-M "Snooper" or similar vehiCle mounted inspection piatform to view the <br />underside of the existing bridge (expected to be necessary if similar equipment is not <br />available through Craig or on loan from COOT to Craig.) <br /> <br />. Overall project management including purchase agreement re-negotiation, public <br />meetings, funding assistance, etc., which is not directly technically oriented. <br /> <br />. Permitting, topographic or land survey, design of facilities or other final design stage <br />activity. <br /> <br />. Generating any documentation which might specifically be subsequently needed by <br />any third party financing, regulatory, etc., agency. <br /> <br />. Any fish exclusion facilities evaluation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.