<br />SECTION 6 - COLLATERAL <br />The collateral provided for this loan, as evidenced by the executed Deeds of Trust, <br />attached as Appendix 3a and 3b, and a Security Agreement attached as Appendix <br />3c, shall be an undivided one hundred percent interest in: (1) Hettinger Farm Recharge <br />(land consisting of approximately 89 acres and water recharge credits generated by the <br />Farmers Pawnee Canal Company), and (2) Bundy Farm (150 acres irrigated), as more <br />particularly described in the attached Deeds of Trust (Collateral"). <br />SECTION 7 - ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />The value of the collateral will be equal or greater in value than the CWCB loan <br />amount as established by a Colorado Certified General Appraiser in compliance with <br />CWCB Loan Policy No.5. BORROWER submitted two Uniform Agricultural Appraisal <br />Reports prepared by Kirk Lieurance, ARA, of Fort Morgan, Colorado, for the two <br />properties pledged as collateral for this loan, establishing the combined value of the <br />collateral at $352,000. <br />SECTION 8 - CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. The BORROWER'S and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />S 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall. be selected by the <br />BORROWER and found acceptable by the CWCB staff. \ <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bcnd at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER shall conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by <br />the CWCB staff. <br />I. The BORROWER shall construct the PROJECT in accordance with the approved plans <br /> <br />Page 2 of 3 <br />