My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150191 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150191 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:03:24 AM
Creation date
3/26/2007 10:47:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150191
Contractor Name
Buffalo Farms Water Development, LLC
Contract Type
Loan
Water District
64
County
Logan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The Selected Project <br /> <br />BFWD plans to pursue alternative #3. Features of this alternative <br />are as follows: <br /> <br />Drill one new well to pump water into recharge ponds. The <br />well would pump up to a maximum rate of 3500 gpm. This would <br />produce approximately 1400 acre feet annually from the well <br />based on 90 days of free river. The only major winter water <br />right below this proposed well is for Julesburg Reservoir <br />and even with the reservoir 6~pty the last few years the <br />majority of the winter has been available for recharge. The <br />well would both be located within 100 feet of the South <br />Platte River. <br /> <br />Two new recharge ponds will be constructed at locations to <br />be filled by the recharge well along with one existing pond <br />already constructed along the pipeline route. <br /> <br />Piping will be used to convey water from the well to the <br />proposed recharge ponds. Piping will be 18 inches in <br />diameter. The piping will be buried. <br /> <br />Four existing wells will be tied into the pipeline to be <br />used as augmentation wells. <br /> <br />See the map in Appendix B for project features locations. <br /> <br />Water Rights <br /> <br />BFWD have decrees on their 11 wells used for irrigating their <br />farms. These wells are augmented through the LWU plan for <br />augmentation. BFWD as individuals also have interest in the <br />following water rights: <br />Pawnee Ditch Company - 12.9 shares <br />South Platte Ditch Company - 21.6 shares <br />Acre-Rights Prewitt Reservoir - Logan District - 264 acre rights <br /> <br />The proposed recharge well is already being list in the LWU plan <br />for augmentation. <br /> <br />,easibility Study <br />Buffalo ,arms <br />Augmentation Project <br />August 2004 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.