My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150191 Approval letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150191 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:03:24 AM
Creation date
3/26/2007 10:47:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150191
Contractor Name
Buffalo Farms Water Development, LLC
Contract Type
Loan
Water District
64
County
Logan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADb <br />I <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />PAX: (303) 8664474 <br />www.cwcb.state.co.us <br /> <br /> <br />TO: <br /> <br />I <br />Russell Georgr . <br />Executive DiI~r <br /> <br />Rod Kuharichj <br />CWCB Direct r <br /> <br />DanMcA= <br />Deputy DiIecrr <br /> <br />I <br />I <br />I <br />I <br /> <br />Rechalrge <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Buffalo Farms Water Development, LLC(Company) is applying for a $193,500 loan from I the <br />Severance Tax Trust Fund Perpetual Base Account, to enhance and expand an existing ground'^1ater <br />recharge project for well augmentation. The estimated total cost of the project is $215,000. PI~ase <br />see the attached Project Data Sheet. I <br />! <br /> <br />MEMORANDUM <br />(Updated November 30, 2004) <br /> <br />Bill Owens <br />Governor <br /> <br />FROM: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Bruce Johnson, P.E. ~~. ~ <br />Mike Serlet, P .E., Chief V' <br />Water Supply Planning an Finance Section <br /> <br />DATE: <br /> <br />November 5, 2004 <br /> <br />SUBJECT: <br /> <br />Agenda Item 14b, November 16-17,2004 Board Meeting <br />Water Supply Planning and Finance Section - New Loans <br />Buffalo Farms Water Development, LLC - Groundwater <br />Project <br /> <br />Introduction <br /> <br />Backaround <br /> <br />The Company is a recently formed entity consisting of neighboring farmers who own and operat~ a <br />contiguous group of farms in northeastern Colorado. They are located in Logan County, I <br />approximately 1 1/2 miles southwest of Merino. Even though the proposed project construction lies <br />on the north side of the South Platte River, the irrigated acres to be covered by the project are <br />located on both sides. The Company is a consortium of three ownership groups, each owning a 1/3 <br />interest in the new Company and the proposed recharge project. A 1/3 interest in the project willi <br />be held by D. Kevin Vollmer, and a 1/3 interest held by Michael Goss. The remaining 1/3 interest <br />will be held by 5 separate entities known collectively as the Merino Properties Group, representJd <br />by Mark A. Kross. l <br />I <br />I <br />Overall, the farm ground to be covered by the recharge project consists of approximately 1000 I <br />acres of sprinkler and flood irrigated land. Some of the ground is irrigated with direct flow water ~nd <br />some has reservoir water. All of the ground is irrigated with 11 tributary groundwater wells, withl <br />some of the land relying solely on the wells. The water is typically used to irrigate corn, alfalfa, I <br /> <br />beans, and wheat. I <br /> <br /> <br />I <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection I <br />Water Supply Protection. Conservation and Drought Planning I <br /> <br />i <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.