Laserfiche WebLink
<br />Glenwood Irrigation Company <br />May 23, 2002 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCB Desiqn and Construction Administration Procedures. Tim <br />Feehan will contact you regarding the CWCB requirements concerning project bidding, design, <br />and construction. Tim will make construction inspections, which will be the basis of the monthly <br />pay estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Small Project Loan from the <br />Colorado Water Conservation Board. <br /> <br />~~ <br /> <br />Mike Serlet, PE, Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachments: <br /> <br />Updated Memo: Glenwoodlrrigation502memo <br /> <br />cc (w/Attachment 1.): <br /> <br />Mr. Greg Hoskin, Board Member, Colorado Water Conservation Board <br />Jim Wells, P.O. Box 1825, Carbondale, Colorado 81623 <br />Dennis Davidson, NRCS, 401 23rd Street, Suite 106, Glenwood Springs, CO 81601 <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />C: wp51\Proj-New\Glenwoodlrrigation 5021tr <br />