My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000466
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000466
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 2:58:22 PM
Creation date
3/26/2007 10:46:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150173
Contractor Name
Upper Surface Creek Domestic Water Users Association
Contract Type
Loan
Water District
0
County
Delta
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Upper Surface Creek Domestic Water Users Association <br />March 16-17,2004 <br /> <br />Agenda Item 25h <br /> <br />Water Project Construction Loan Program - Project Data <br /> <br />Borrower: <br /> <br />Upper Surface Creek Domestic <br />Water Users Association <br /> <br />Project Name: Spaulding Peak Water Intake <br /> <br />Drainage Basin: Gunnison <br /> <br />Total Project Cost: $180,200 <br /> <br />Type of Borrower: Municipal (Low-Income) <br /> <br />CWCB Small Project Loan: $162,180 <br /> <br />County: Delta <br /> <br />Project Type: New Raw Water Intake/Pipeline <br /> <br />Water Source: Surface Creek <br /> <br />Funding Sources: CWCB, USCDWUA <br /> <br />Aver. Delivery: 264 acre-feet <br /> <br />Interest Rate: 3.25% Term: 20 years <br /> <br />The USCDWUA is a rural domestic water provider serving a 40 square mile service area on the <br />south side of Grand Mesa in Delta County, east of SH 65 and immediately adjacent to the Town of <br />Cedaredge. They currently serve 770 water customers, and provide an average of 86 million <br />gallons (264 acre-feet) of water per year. USCDWUA owns its raw water, but relies on the Town of <br />Cedaredge for water treatment. Unable to acquire more plant capacity from the Town, <br />USCDWUA will construct a new treatment plant and raw water collection system. The new raw <br />water intake for the treatment plant would be located on Surface Creek, northeast of Cedarege. <br />The new 15" PVC raw water pipeline would extend southwest from the intake approximately 3000 <br />feet to the new treatment plant. The estimated cost of the completed water treatment plant project, <br />including the raw water portion, is $1.32 million. The CWCB loan is for the raw water intake and <br />delivery pipe only. The project involves construction of a rock diversion structure in Surface Creek, <br />a concrete pipeline intake, followed by screening and sedimentation structures to provide settling <br />time for the removal of sand, grit, and heavier silt. The raw water intake and approximately 2/3 of <br />the pipeline will be located on easements that have been acquired and recorded. The remainder of <br />the pipeline and the treatment plant itself will be located on property owned by USCDWUA. <br /> <br /> <br /> <br />Location Map <br /> <br />Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.