Laserfiche WebLink
hundred percent (100%) interest in the BoRROwER's diversion structure and raw water <br />pipeline, as more particularly described in the attached Deed of Trust ("Collateral"). <br />SECTION 7— ADDITIONAL CONDITIONS $c CONTRACT REQUIREMENTS <br />No additional conditions or contract requirements <br />SECTION $— CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BoRROwFR shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PRO�ECr. <br />B. The BORROWER and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37-87-105 C.R.S., the BoRROwER shall provide a letter of approvaf from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction cor�tract. <br />E. The BoRROwER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BoRROwER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />perFormance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BoRROwER may issue the notice to �proceed to the <br />Construction Firms. <br />G. The BORROWER shall conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PRO�ECT requires a resident inspector during <br />construction, the BoRROwER shall employ an inspector who has been approved by <br />the CWCB staff. <br />I. The BoRROwER shall construct the PRO�ECr in accordance with the approved plans <br />and specifications. <br />J. Upon completion of the PRO�ECT construction, the BoRROwER shall provide as-built <br />drawings of the PRO�ECr to the CWCB staff, or, if required by § 37-87-105, C.R.S., <br />the BoRROwER shall provide the as-built drawings to the State Engineer's Office for <br />approval and filing. <br />K. Upon completion of the PRO�ECT construction, the BoRROwER shall arrange a final <br />inspection for the CWCB staff. <br />L. The BoRROwER shall pay all of the expenses related to the PRO�ECr when such bills <br />are due. <br />M. PRO�ECT-related expenses incurred prior to the Effective Date of this contract in <br />accordance with the legislative approval of this loan. <br />Page 2 of 3 <br />