My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000463
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000463
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:23 AM
Creation date
3/26/2007 10:46:15 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150123
Contractor Name
Stromberger Land & Cattle Company, LLC
Contract Type
Loan
Water District
64
County
Logan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Stromberger Land & Cattle Company LLC <br />November 25-26, 2002 <br /> <br />Agenda Item 20b <br /> <br />wells. By generating its own augmentation water SLCC hopes to protect itself from possible <br />curtailment and help GASP strengthen its coverage in the same area of the river. <br /> <br />Feasibility Studies <br /> <br />A feasibility study has been completed by Brad Stromberger, owner, and engineer Brent Nation, <br />P.E. of Fort Morgan, in accordance with CWCB guidelines. The study includes an assessment of <br />alternatives available to generate augmentation alternatives for SLCC. <br /> <br />The Stromberaer land and Cattle Company. llC <br /> <br />The SLCC is a privately owned family farm operation in Northeastern Colorado. SLCC is a limited <br />liability company and has never been incorporated. It is owned by four members of the <br />Stromberger familiy, with each member having an equal share. They have been in operation since <br />1971. <br /> <br />Water Riahts <br /> <br />SLCC currently has decrees on the 12 wells used for irrigating the SLCC farm. These wells are <br />augmented through GASP. The proposed 6 recharge wells and one augmentation well will require <br />a new water right which is currently being sought. This new water right will be for a maximum of 35 <br />cfs with an average annual yield of 6500 acre-feet. According to the State Engineer's Office, the <br />SLCC has applied for the well permits, and review is in progress. <br /> <br />Proiect Description <br /> <br />Three alternatives to generate augmentation supply for SLCC were considered in the feasibility <br />study: <br /> <br />1. No-action alternative. <br />2. Purchase a senior water right and use it for augmentation. <br />3. Construct a series of recharge ponds using recharge wells. ($460,000) <br /> <br />Alternative 1, No-action, was not considered acceptable due to the continuing changes in the water <br />community as a result of extreme drought conditions. Supplies currently used augment the 12 <br />SLCC wells are entirely secured by GASP on a one-year lease basis. If any of the leases are not <br />renewed, or cannot be renewed due to drought conditions, the SLCC could not operate their wells. <br />This would be an annual loss of approximately 5,000 acre-feet, leading to major loss of crops. <br /> <br />Alternative 2, Purchase a senior water right and use it for augmentation, while a common option for <br />Front Range communities, this was not considered financially viable for SLCC. SLCC found that <br />the only available water right for sale in the area was with a farm controlling the Ramsey Ditch. The <br />Ramsey Ditch is a12 cfs direct flow right with a priority date of August 1894. In order to obtain the <br />water right the entire farm would have to be purchased at a price of $1.25 million, not including legal <br />fees to convert the water right to augmentation use. <br /> <br />Selected Alternative 3, Construct a series of recharge ponds filled using recharge wells was <br />selected as the desired alternative. This alternative would consist of drilling 6 wells to pump water <br />into a series of recharge ponds in the winter months when there is not a call on the river. Water <br />from the ponds would have a delayed return to the river in summer months when SLCC has <br />depletions that need to be offset with augmentation water. The 6 wells, drilled within 100 feet of <br />the South Platte River, would pump up to a combined rate of 35 cfs producing up to 6500 acre feet <br />annually. They would pump to the recharge ponds through 18" to 21" underground piping. The <br /> <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.