Laserfiche WebLink
<br />PROJECT SUMMARY-STROMBERGER LAND & CATTLE-CONTRACT No. C150123 <br /> <br />SECTION 1 -BORROWER INFORMATION <br />Name: Stromberger Land and Cattle Company <br />Address: 14063 Summit Drive <br />Sterling, CO 80751 <br />Brad Strom berger, Manager/Operator <br /> <br />970-522-8169 <br /> <br />Contact: <br />Phone Number: <br />Email: <br />Type of Entity: <br /> <br />stromber@kcLnet <br /> <br />Colorado limited liability company, owned by four members of <br />the Stromberger family, each member having an equal share <br />in the company. <br /> <br />SECTION 2 - PROJECT DESCRIPTION <br /> <br />Description of PROJECT: The BORROWER is a private family farm located in Logan County. <br />The farm consists of approximately 1923 acres farm ground, irrigated with 12 tributary <br />groundwater wells that were drilled in the late 1960's and early 1970's and pump on <br />average 5000 acre-feet annually, The 12 wells .are currently augmented under the <br />Groundwater Appropriators of the South Platte (GASP) plan of operation. The <br />BORROWER is completely dependent on their 12 wells, which have very junior water rights <br />and using GASP to replace depletions from well pumping when there is a senior water <br />right call on the river. The Project will consist of the construction of 6 wells to pump <br />water into a series of recharge ponds in the winter months when there is not a call on the <br />river. Water from the ponds would have a delayed return to the river in summer months <br />when the BORROWER has depletions that need to be offset with augmentation water. <br />The wells, drilled near the South Platte River, would pump a combined rate of up to 35cfs <br />producing approximately 6500 acre-feet annually to the recharge ponds through <br />underground piping. A single well drilled away from the river would be constructed for <br />augmentation, and use the piping to return stored water to the river when necessary <br />("PROJECT") at a total cost of approximately $460,000. <br /> <br />Description of Feasibility Study: The CWCB assisted in the preparation of a feasibility <br />study report entitled Feasibility of Construction of the stromberger Land & Cattle Company <br />Recharge Project dated October 2002, incorporated herein by reference, and has reviewed <br />said report. Based upon the report, the CWCB determined the PROJECT to be technically <br />and financially feasible. <br /> <br />SECTION 3 - CWCB's AUTHORITY <br /> <br />Small Proiect Loan: This loan is made pursuant to the provisions of 99 37-60-119 and <br />37-60-120, C.RS., which authorizes the CWCB to loan money for water projects for the <br />benefit of the people of the State, provided that the borrower assures repayment of that <br />money. <br /> <br />Section 37-60-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br />$1,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust Fund <br />Perpetual Base Account Fund without prior approval from the General Assembly <br /> <br />Appendix 1 to Loan Contract C150123 <br />