My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150159 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150159 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2016 9:16:06 AM
Creation date
3/26/2007 10:42:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150159
CT2017-1209
Contractor Name
Orphan Wells of Wiggins, LLC
Contract Type
Loan
Water District
1
County
Morgan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Rights <br /> <br />OWW has applied for well permits for both its recharge and <br />augmentation wells. These wells will pump water to cover <br />depletions of approximately 4,000 acre-feet per year. The <br />augmentation well will have a capacity of 3,000 gpm (6.7 cfs), <br />and the recharge well will have a capacity of 2,000 gpm to 4000 <br />gpm (4.5 cfs to 9 cfs) depending on the thickness of the alluvium <br />at the well site. Although these wells will have the capability <br />to divert (pump) up to 5,000 acre-feet each per year, actual <br />diversions will vary depending upon calls on the river. <br /> <br />The 31 shareholders of the OWW have decrees on their 45 wells <br />used for irrigating 4,500 acres. These wells have been augmented <br />through GASP in prior years. The OWW shareholders divert on <br />average approximately 6,000 acre-feet of water per year through <br />these 45 wells. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $1,153,000. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />$255,000 <br />$898,000 <br /> <br />Total Cost <br /> <br />$1,153,000 <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Recharge Well <br />2. Augmentation Well <br />3. 24" PVC Pipe Installed (26,400 If) <br />4. Construction of 23 new recharge sites <br />5. Planning/Design Costs, Easements <br /> <br />$ 70,000 <br />$ 70,000 <br />$528,000 <br />$230,000 <br />$255,000 <br /> <br />Total Cost <br /> <br />$1,153,000 <br /> <br />Feasibility Study <br />OWW Aug Project <br />October 2003 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.