My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150168 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150168 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:26:08 AM
Creation date
3/26/2007 10:41:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150168
Contractor Name
Fulton Irrigation Ditch Company
Contract Type
Loan
Water District
1
County
Adams
Bill Number
SPL
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />April 8, 2004 <br /> <br />Russell George <br />Executive Director <br /> <br />Mr. Brice Steele, Secretary <br />Fulton Irrigation Ditch Company <br />25 South 4th Avenue <br />Brighton, CO 80601 <br /> <br />Rod Kuharlch <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Re: Dear Mr. Steele <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board approved your loan <br />request on March 17, 2004 The loan is for the rehabilitation of the Fulton Irrigation Ditch Company <br />diversion structure. <br /> <br />The Board approved the Construction Fund Loan in a maximum amount of$171,700. The loan <br />terms are 2.8% for 20-years. I have attached a copy of the updated Board memo concerning the Fulton <br />Irrigation Ditch Company's loan request. Please refer to page 4 of that memo and to the Section <br />"Action taken by the CWCB, dated March 17,2004". <br /> <br />The Board's approval was based on the Fulton Irrigation Ditch Company meeting the following <br />conditions: <br /> <br />1. A Feasibilitv Study is required. Tim Feehan has reviewed the study entitled "Feasibility <br />Study - Fulton Irrigation Ditch Company Diversion Structure Repair", prepared for the <br />Colorado Water Conservation Board and finds the study to meet the requirements of the <br />Colorado Water Conservation Board Construction Guidelines. <br /> <br />2. An ao-proved contract must be in-place before loan funds can be advanced. Jan Illian with <br />our office will be contacting you to initiate this process in the near future. If you should have <br />any questions, Jan's phone number is 303-866-3462. <br /> <br />3. You must adhere to the CWCB Design and Construction Guidelines. Tim Feehan has been <br />in contact with your regarding CWCB's requirements for project design, bidding, and <br />construction inspection. Please contact Tim Feehan to discuss the disbursement of your <br />loan funds. Tim can be reached at 303-618-5010. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought P1anning <br />
The URL can be used to link to this page
Your browser does not support the video tag.