Laserfiche WebLink
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />April 8, 2004 <br /> <br />Russell George <br />Executive Director <br /> <br />Mr. Brice Steele, Secretary <br />Fulton Irrigation Ditch Company <br />25 South 4th Avenue <br />Brighton, CO 80601 <br /> <br />Rod Kuharlch <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Re: Dear Mr. Steele <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board approved your loan <br />request on March 17, 2004 The loan is for the rehabilitation of the Fulton Irrigation Ditch Company <br />diversion structure. <br /> <br />The Board approved the Construction Fund Loan in a maximum amount of$171,700. The loan <br />terms are 2.8% for 20-years. I have attached a copy of the updated Board memo concerning the Fulton <br />Irrigation Ditch Company's loan request. Please refer to page 4 of that memo and to the Section <br />"Action taken by the CWCB, dated March 17,2004". <br /> <br />The Board's approval was based on the Fulton Irrigation Ditch Company meeting the following <br />conditions: <br /> <br />1. A Feasibilitv Study is required. Tim Feehan has reviewed the study entitled "Feasibility <br />Study - Fulton Irrigation Ditch Company Diversion Structure Repair", prepared for the <br />Colorado Water Conservation Board and finds the study to meet the requirements of the <br />Colorado Water Conservation Board Construction Guidelines. <br /> <br />2. An ao-proved contract must be in-place before loan funds can be advanced. Jan Illian with <br />our office will be contacting you to initiate this process in the near future. If you should have <br />any questions, Jan's phone number is 303-866-3462. <br /> <br />3. You must adhere to the CWCB Design and Construction Guidelines. Tim Feehan has been <br />in contact with your regarding CWCB's requirements for project design, bidding, and <br />construction inspection. Please contact Tim Feehan to discuss the disbursement of your <br />loan funds. Tim can be reached at 303-618-5010. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought P1anning <br />