Laserfiche WebLink
<br />I"""" .J..- ~ <br /> <br />100 c.(.-+~ i <br />II.> V"') ( l"......... (l' .y <br /> <br />C\VCB Construction Fund Loan Application //. <br /> <br />4. Please provide a brief description ~fthe owner's existing water supply facilities and describe any <br /> <br />,.,e-H <br /> <br />existing operational or maintey4nce problems. Attach separate sheets if needed, and a map of <br />the service area. 14 u i t~ of GASP for 5 wells that supply water for <br /> <br /> <br />irrigation. Seeking augmentation to cover wells. See map 1a. <br /> <br />For existing facilities indicate: <br />Number of shareholders <br />Current Assessment per share $ <br />Number of acres irrigated 72 2 . 6 <br /> <br />or Number of customers served <br /> <br />Number of shares <br /> <br />Part B. - Description ofthe Project <br />1. Name of the project or facility Stieb Recharge <br /> <br />2. Purpose of this loan application. Check one. <br />X New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES _ NO-X.. <br /> <br />4. Genera1location of the project. (please include county, and approximate distance and direction <br />from nearest town, as well as legal description, if known. 3 mil e s sou tho f Il iff, CO <br />in Logan County Sec. 20 T9N R51W <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sh~et, if needed. _ <br />Our purpose is to pump water to ponds when call lS not on the <br /> <br />river for substitute supply plan then pump water back to the <br /> <br />river to augment when needed. See map 3a. <br /> <br />Water Right: <br /> <br />12.2CFS. <br /> <br />Average water diverted per year: 24 0 0 acre-feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES ---X- NO <br /> <br />2 CFLA902 <br />