My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000429
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000429
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:09:26 AM
Creation date
3/26/2007 10:41:03 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150136
Contractor Name
Stieb Brothers, Inc.
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />C\VCB Construction Fund Loan Application <br /> <br />4. Please provide a brief description of the owner's existing water supply facilities and describe any <br />existing operational or maintenance problems. Attach separate sheets if needed, and a map of <br />the service area. 14 units of GASP for 5 wells that supply water for <br /> <br />irrigation. Seeking augmentation to cover wells. See map 1a. <br /> <br />For existing facilities indicate: <br />Number of shareholders <br />Current Assessment per share $ <br />Numberofacresllrigated 722.6 <br /> <br />or Number of customers served <br /> <br />1 <br /> <br />Number of shares <br /> <br />Part B. - Description of the Project <br />1. Name of the project or facility Stieb Recharge <br /> <br />2. Purpose of this loan application. Check one. <br />X New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES _ NO-.K.. <br /> <br />4. General location of the project. (please include county, and approximate distance and direction <br />from nearest town, as well as legal description, ifknown. 3 miles south of Iliff, co <br />in T,ogi'ln County Sec. 20 T9N R51W <br /> <br />5. Please provide a brief narrative description of the proposed project including pwpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sh~et, if needed _ <br />Our purpose is to pump water to ponds when call lS not on the <br /> <br />river for substitute supply plan then pump water back to the <br /> <br />river to augment when needed. See map 3a. <br /> <br />Water Right: <br /> <br />12.2CFS. <br /> <br />Average water diverted per year: 2 4 0 0 acre-feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES -X...- NO <br /> <br />2 CFLA902 <br />
The URL can be used to link to this page
Your browser does not support the video tag.