My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000425 (2)
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000425 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 8:29:43 AM
Creation date
3/26/2007 10:40:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150136
Contractor Name
Stieb Brothers, Inc.
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the BORROWER shall provide the as-built drawings to the State Engineer's Office for <br />approval and filing. <br /> <br />K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff. <br /> <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br />are due. <br /> <br />SECTION 8 - ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> <br />A. Preparing final designs and specifications for the PROJECT. <br /> <br />B. Preparing bid and construction contract documents. <br /> <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br /> <br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br /> <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br /> <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BORROWER. <br /> <br />G. Engineering services for construction management, including design and <br />construction management for CWCB-approved change orders. <br /> <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.4 herein. <br /> <br />I. Legal services for reviewing engineering services contracts, reviewing this Contract, <br />reviewing construction contract documents, and for complying with all federal, state, <br />and local regulatory requirements. <br /> <br />SECTION 9 - DISBURSEMENT SCHEDULE <br /> <br />The BORROWER shall prepare a periodic progress report which contains a statement <br />of the PROJECT costs expended for that period and shall forward said statement to <br />the CWCB. After receipt of the periodic progress report from the BORROWER, and <br />review and acceptance of the items therein as eligible expenses as described <br />below, the CWCB will pay to the BORROWER the amount set forth in the report or <br />such portion that has been approved by the CWCB. Such payment shall be made <br />within thirty (30) days from the CWCB's approval of each progress report. The <br />BORROWER shall obtain all necessary permits and easements prior to any loan <br />disbursements. <br /> <br />SECTION 10 - TIME FOR PERFORMANCE <br /> <br />PROJECT Beginning: Upon Effective Date of this Contract which is the date this <br />contract is approved by the State Controller. <br /> <br />PROJECT Finish: 2 years from the Effective Date of this Contract <br /> <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.