Laserfiche WebLink
<br />Mr. Allen Ringle, Superintendent <br />Lake Meredith Reservoir Co. <br />March 27, 2003 <br /> <br />Page 2 <br /> <br />b) An approved contract must he in place before funds can be advanced Jan lIIian <br />has placed this loan on our "hot list" and will initiate the loan contracting process <br />with a goal of having a signed contract in place by June 2003. Once the contract is <br />finalized the Company may request loan funds to cover eligible project <br />expenditures. <br /> <br />c) You must adhere to the CWCS Design and ConstnJction Administration <br />Procedures Tim Feehan will contact you regarding the CWCB requirements <br />concerning project bidding, design, and construction. Tim will make construction <br />inspections, which will be the basis of the pay estimates for disbursement of your <br />loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Small Project Loan <br />from the Colorado Water Conservation Board. <br /> <br />;4~ <br /> <br />~l~et, P.E., Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachment: <br /> <br />Updated Memo: Lake Meredith 303 memo <br /> <br />Cc (w/attachment): Mr. Harold E. Miskel, Colorado Water ConseNation Board <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />C:\Proj-New\Lake Meredith 303 Ltr <br />