My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150137 Approval letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150137 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 3:02:54 PM
Creation date
3/26/2007 10:39:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150137
Contractor Name
Lake Meredith Reservoir Company, The
Contract Type
Loan
Water District
17
County
Crowley
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />In February of 2003 the Reservoir Company provided a feasibility report to the Colorado Water <br />Conservation Board, prepared by Steffens and Associates, Evergreen, Colorado to construct a new outlet <br />channel that would mitigate future sediment problems and allow the Reservoir Company to access the <br />17,000 acre-foot dead pool. <br /> <br />Below is a brief summary of the major project elements and their estimated cost as presented in the <br />original feasibility study: <br /> <br />Excavate Main Channel = <br />(923,500 c.y.@$0.85/c.y.) <br />Construct New Outlet Structure <br />Construct Bob Creek Stormwater Inlet = <br />Engineering and Permits <br />Loan Origination Fee <br />Sub-total: = <br />Contingency <br />Construction Total: <br /> <br />$785,000 <br /> <br />$400,000 <br />$100,000 <br />$82,000 <br />$10.000 <br />$1,377,000 <br />$147,800 <br />$1,524,800 <br /> <br />Pate Construction, Pueblo, Colorado and the Colorado Canal Company, Ordway, Colorado is <br />constructing the channel cooperatively on a time and material basis. Bids have been received for work on <br />the outlet structure. Excavation of the channel commenced in winter/spring of 2003 and is scheduled for <br />completion in spring of 2004. <br /> <br />During construction of the project the Reservoir Company encountered added cost during channel <br />excavation, higher then anticipated cost in constructing the outlet structure, and new costs associated with <br />added construction items that were not in the original feasibility report. <br /> <br />Channel Excavation: <br /> <br />The original cost estimate for channel excavation was based on $0.85 per cubic yard. The engineer <br />obtained the cost per cubic yard based on a detailed cost evaluation that included equipment comparisons, <br />performance expectations of the equipment, labor arrangements and field verification. <br /> <br />During construction, however, wetter then expected clay soils proved difficult to handle. The <br />cohesive property of the soil created build-up in the excavator bucket and the bearing capacity of the soil <br />would not support the D9 Dozer with its standard track width. In an attempt to increase productivity in the <br />field the Company investigated four different equipment arrangements. The selected equipment <br />arrangement that worked well with the soil conditions present required additional equipment and more <br />labor. The total equipment cost increased from $243/hour to $343/hour and required three more operators. <br />With the new equipment in place the cost per cubic yard, however, was lowered from $2.00 to $1.50. The <br />overall project cost per cubic yard varied from $0.94 to $2.69 with a final project cost of approximately <br />$1.35 per cubic yard. <br /> <br />Added Cost: $460,645 <br /> <br />Flood Protection. Water Project Planning ~d Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.