Laserfiche WebLink
<br />,.- <br />( <br /> <br />PAID <br />IN FULL <br /> <br /> <br />LOAN CONTRACT <br />Lower Arkansas <br />Water Management Association <br />Feasibility Study <br /> <br />llh. (Contract price can be adjusted if unit cost are later found to be <br />inaccurate): The original contract price stated in paragraph 4. and any additions thereto <br />shall be adjusted to exclude any significant sums by which the State determines the contract <br />price has been increased due to inaccurate, incomplete, or noncurrent wage rates and other <br />factual unit costs. All such contract adjustments shall be made within one (1) year <br />following the State's acceptance of the feasibility study. <br /> <br />12. (Addresses for Mailing): All notices, correspondence, or other documents <br />required by this contract shall be delivered or mailed to the following addresses: <br /> <br />a. For the State <br /> <br />b. For the Borrower <br /> <br />Daries C. Lile, P.E., Director <br />Colorado Water Conservation Board <br />Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />Attn: John VanSciver <br /> <br />Lower Arkansas Water <br />Management Association 721 State <br /> <br />P.O. Box 1161 <br />Lamar, CO 81052 <br />Attn: Donald F. Higbee <br />Manager <br /> <br />W:\WClRANSILA WMA,tk <br /> <br />Page 10 of 12 Pages <br />