My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000403
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:21 AM
Creation date
3/26/2007 10:37:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150067
Contractor Name
Lower South Platte Water Conservancy District
Contract Type
Loan
Water District
64
County
Logan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br />( " I <br />I ~"l <br />-.- [ I <br />! <br /> <br />STATE OF COLOMDO <br /> <br />Q <br /> <br />.. <br /> <br />June 6, 2001 <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E, Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Mr. Robert Schott, Manager <br />Lower South Platte WCD <br />100 BroadwayPlaza, #12 <br />Sterling, CO 80751 <br /> <br />RE: Augmentation and Groundwater Recharge Project <br />Small Project Loan Approval <br /> <br />Dear Bob, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) approved your <br />Small Project Loan request on May 21, 2001. The loan is for the augmentation and groundwater <br />recharge project near Julesburg. <br /> <br />The Board approved a Small Project Loan from the Construction Fund in a maximum amount of <br />$100,000. The loan terms are 3% for 10 years. I have attached a copy of the updated Board memo <br />concerning the Lower South Platte Water Conservancy District. Please refer to page 4 of that <br />memo and to the section "Action taken by the CWCB May 21,2001." <br /> <br />When the Board approves a Small Project Loan there remain several conditions: <br /> <br />a) A Feasibility Study is required. John Van Sciver has completed a draft of the study, which will <br />be forwarded to you for your review and comment. The study will then be completed so that it <br />meets the requirements of the CWCB Construction Fund Guidelines for feasibility studies. <br /> <br />b) An approved contract must be in place before funds can be advanced. Jan IIlian has placed <br />this project on our contracting "hot list" and has initiated the loan contracting process. I <br />understand the project will be constructed in late spring 2001, and that the District will need <br />funds to pay contractor bills in the very near future. Our goal is to have the loan contract signed <br />by all parties by July 15, 2001. <br /> <br />c) You must adhere to the CWCB Desiqn and Construction Administration Procedures. John Van <br />Sciver will contacted you regarding the CWCB requirements concerning project bidding, <br />design, and construction. John will make construction inspections that will be the basis for <br />disbursement of your loan funds. <br /> <br />d) You must adhere to the CWCB Guidelines for Financial Assistance. <br /> <br />Flood Protection · Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.