Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />WATER LEASE AGREEMENT <br /> <br />~ <br />THIS WATER LEASE AGREEMENT, is made this 50..- day of June, 2001, by and <br />between, Lower South Platte Water Conservancy District Water Activity Enterprise, 100 <br />Broadway Plaza #12, Sterling, Colorado 80751 ,hereinafter referred to as "Lower;" and the <br />Groundwater Appropriators of the South Platte River Basin, Inc, P,O, Box 974,Fort Morgan, <br />Colorado 80701, hereinafter referred to as "GASP." <br /> <br />WITNESSETH: <br /> <br />WHEREAS, GASP is in need of replacement water to replace out-of-priority <br />depletions from well pumping and desires to lease water from Lower; and, <br /> <br />WHEREAS, Lower has an Agreement with Farmers Grain Co, of Julesburg (James <br />G, Kontny, President), hereinafter Farmer's Grain CO.,dated June _,2001 to drill a well, <br />hereinafter the "well" on property owned by Farmers Grain, being Lot 1 in the SE1/4 of <br />Section 20, Township 12 North, Range 44 West of the 6th PM in Sedgwick County, <br />Colorado, hereinafter the "property." The well is for use as a replacement source to <br />replace out-of-priority depletions from irrigation well pumping by delivery of water from the <br />well to the State Line Canal and the South Platte River, The Lower/Farmers Grain <br />Agreement also provides that Farmers Grain shall lease to Lower 80% of the accretion <br />credits from recharge ponds located on the property to replace depletions from the well; <br />and, <br /> <br />WHEREAS the parties desire to set out the terms of a. water lease agreement by <br />which GASP may lease water from the well and lease accretion credits to the South Platte <br />River resulting from the recharge ponds, <br /> <br />NOW, THEREFORE, in consideration of the mutual promises and covenants of the <br />parties hereto, it is agreed as follows: <br /> <br />1. Lower agrees to lease all the water pumped from the well to GASP subject to the <br />terms and conditions of this Agreement. <br /> <br />2. Lower shall pay all the costs of drilling, installing a casing and pump, providing an <br />electrical power hookup to Highline Electric Association and piping the well water <br />to the State Line Canal, provided that such costs shall not exceed $66,000,00 <br />without approval by GASP, Construction and operation cost estimates are attached <br />hereto as Exhibit A. Lower shall be responsible for obtaining all well permits or other <br />approvals necessary to drill and use the well. Lower shall obtain and keep in force <br />insurance coverage on the well and pipeline. Lower shall operate, maintain, and <br />repair the well, pump, and pipeline. <br /> <br />3. This Agreement is contingent upon Lower obtaining financing for all the costs <br />necessary to drill the well and install the pump, associated equipment and pipeline <br />described in ~2, The terms of the financing agreement shall be subject to the <br />approval of both Lower and GASP. This Agreement is also contingent on Lower <br />obtaining an agreement from the Julesburg Irrigation District and Peterson Canal <br />& Reservoir Company for use of the State Line Ditch to convey the well water to the <br />South Platte River. <br /> <br />F:\KIM\LSP\Augmentation Well\LSPWCD GASP Agreement 6-1-01,wpd <br /> <br />1 <br />