My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000398
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000398
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:21 AM
Creation date
3/26/2007 10:36:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153389
Contractor Name
Kern Reservoir and Ditch Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />10. <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. <br /> <br />Board approval of engineering firm and engineering <br />agreement between engineering firm and project sponsor. <br /> <br />2. <br /> <br />Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br /> <br />3. <br /> <br />Approval of detailed plans and specifications by Board <br />staff (pians and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />office). <br /> <br />Board staff approval ~~~ng for the project. Board <br />staff present at bi ~~for construction. <br /> <br />Project sponsor may ssue ~~-(.,~e of award and the <br />notice to proceed with ~~~ion to the contractor <br />(both notices must ap~oved by the Board staff before <br />they are issued). '\: <br /> <br />Conduct a pre-construction conference. Approval .of <br />construction schedule by Board staff. <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />7. <br /> <br />Construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br /> <br />8. <br /> <br />The consulting engineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />9. <br /> <br />Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />Submittal of as-built drawings to Board staff for <br />approval and fiiing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.