Laserfiche WebLink
<br />For", 6-AC-02A <br /> <br /> <br />D RTMENT OR AG R <br />34-04-00 <br />CONTRACT ~?.,.IJ!JN~ tUMBER <br />\S <;;;;>.1:_<< <br />$119,500 <br /> <br />CONTRACT <br /> <br />THIS CONTRACT. made this 1st day of September 1982. by and between the <br />State of Colorado for the use and benefit of the Department of '1 Natural Resources <br />(rnlnrano Wat.p.r Conse~tion Board), <br />hereinafter referred to as the State. and '2 the Kern Reservoir and Ditch Company, <br />POBox 700, Windsor. Colorado 80550, <br />hereinafter referred to as the contracto,. <br /> <br />. WHEREAS, au.thority exists in the ~w ds have been budgeted. appropriated and otherwise made <br />available and a suflic,ent unencumber'l reof re a ai bl for ayment in Fund Number 4008, <br />G/L Account Number 534 3~ Cont cumbr -:. . and <br />ABL Account Number 1343 , 0 - - , <br /> <br />WHEREAS, required approval. ~n.ce rdination has been accomplished from and with appropriate <br />agencies; and \\ ~ <br /> <br />WHEREAS, pursuant to the provisions of 37-60-119, Colorado <br />Revised Statutes 1973, as amended, the State is authorized to <br />construct certain water projects for the benefit of the people <br />of the State: and <br /> <br />WHEREAS, the Contractor is a reservoir and ditch company <br />in the State of Colorado and wishes to repair and improve its <br />existing structures, hereinafter called the project, for the <br />company shareholders in Weld County, Colorado, at an estimated <br />cost of Two Hundred Forty Thousand Dollars ($240,000): and <br /> <br />WHEREAS, a feasibility investigation of said project was <br />conducted and it was found that such a project is economically <br />feasible: and <br /> <br />WHEREAS, the State has agreed to construct said project and <br />to sell the same to the Contractor upon mutually agreeable <br />terms and conditions, subject to the availability of funding <br />for that purpose: and <br /> <br />WHEREAS, pursuant to Senate Bill No. 439, Fifty-Third <br />General Assembly of the State of Colorado, duly enacted into <br />law, the Colorado Water Conservation Board has been authorized <br />to expend a sum not to exceed One Hundred Twenty-Three Thousand <br />Dollars ($123,000) for construction o~t roject: <br /> <br />NOW THEREFORE, in considerat~ mU~l and <br />depe~dent covenants herein contain,..." ~s"\'i.gr~ by the <br />part~es hereto as follows: . .' .~.:~ y <br /> <br />A, The Contractor agrees that ~~l~ <br /> <br />1, Employ an engineering fi~~to prepare project plans <br />and specifications for the proposed project. Both the <br />engineering firm and the project plans and specifications shall <br />be approved by the State, <br /> <br />2, Subcontract the construction of said project to a <br />responsible and capable firm, said project to be completed <br />within t\"i.'O (2) years of the date of this contract in accordance <br />with the project plans and specifications and any necessary <br />modification thereof approved by the S,t~te, The State must <br />approve, in writing, all subcontracts before they become <br />effective. The above-mentidned time may be extended by the <br />State if such time is insufficient because of acts of God or <br />other acts or circumstances beyond the control of the <br />Contractor. <br /> <br />395-5J-01-COlO <br /> <br />103 <br />kern <br /> <br />Page I of ~ pages <br />.(Sce ins.rUClions on rqYc,$C Qr last pa8c.) <br />