My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000395
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:20 AM
Creation date
3/26/2007 10:35:48 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150005
Contractor Name
Loveland, City of
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
HB 98-1189
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e e <br />SUMMARY OF PROPOSED PROJECT <br /> <br />Project Sponsor: City of Loveland <br /> <br />e <br /> <br />Project Name: Green Ridge Glade Reservoir <br /> <br />Type of Project: Municipal and Agricultural <br /> <br />Location: About seven miles west of Loveland in Larimer County (see attached map) <br /> <br />Date of Application: December 26, 1996 <br /> <br />Planning Studies Submitted to Date: Phase I - Drought Study, August 1986; Phase /1- <br />Evaluation of Alternatives, January 1988; Engineering Evaluation, Green Ridge Glade <br />Reservoir Enlargement, March 1996 <br /> <br />Project Description: The City of Loveland is proposing to expand it's existing Green <br />Ridge Glade Reservoir from a capacity of 600 acre-feet to 6,000 acre-feet for municipal <br />and agricultural water supplies. The project will include raising the existing earth <br />embankment dam and replacing the existing intake tower, outlet works, and spillway as <br />well as relocating an existing county road in the reservoir area. The City hopes to begin <br />construction in the year 2000. Water to be stored in the reservoir will come from the <br />City's water rights holdings on the Big Thompson River and the City's shares in the <br />Colorado Big Thompson Project and the Windy Gap Project <br /> <br />e <br /> <br />Estimated Cost: In excess of $17.0 million <br /> <br />Requested Loan: $2.0 million in 1997. A total authorization of $5.0 million to $10.0 <br />million over the next three years <br /> <br /> <br />Existing Green Ridge Glade Reservoir <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.