My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000384
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:23:36 AM
Creation date
3/26/2007 10:33:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150180
Contractor Name
Pinewood Springs Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />!_:'.,~-" ; <br /> <br />.' <br /> <br />. <br /> <br />NEED FOR PROJECT~-------~------~~---- ~ -------------8 <br />******************** <br /> <br />A) Health and Safetv~------------------- - ---~----------8 <br /> <br />B) System 0 & M-, <br /> <br />9 <br /> <br />--- ---- <br /> <br />C) Growth------ <br /> <br />~---------~ -----------10 <br /> <br />ALTERNATIVES CONSIDERED - U~ <br /> <br />--------11 <br /> <br />****************************** <br /> <br />A) Description-------- <br /> <br />-------11 <br /> <br />1) Retain Status Quo- <br /> <br />. ~11 <br /> <br />2) Consolidation of Raw Water Supply and Treatment with other Com- <br /> <br />munities -------- -------------------11 <br /> <br />3) ( Alt. "A") Enlarge Crescent Lake, Install a New Raw Water Trans- <br />mission Line, and Upgrade the Existing Water Treatment Plant--11 <br /> <br />4) (Alt. "B") Enlarge Crescent Lake and Build a New Water Treatment <br /> <br />. Plant -- ---- ~ ---- - --- .----12 <br /> <br />5) ( Alt. "C") Construct a Reservoir in Manre Hollow and Upgrade the <br />Existing Water Treatment Plant- ------ -------13 <br /> <br />6) ( Alt. "D") Reservoirs Within Local Swales and Upgrade the Existing <br />Water Treatment Plant----- ---- -~ ~-- -----13 <br /> <br />(D-l) Lot 5-11tb Filing <br /> <br />--------13 <br /> <br />(D-2) Crow Lane Reservoirs---------------- ---------13 <br /> <br />7) (Alt. "E") Additional Wells Manifolded Together to Increase Raw <br />Water Supply------- ------- --14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.