Laserfiche WebLink
<br />/fr:. <br /> <br />i<' <br /> <br />r.~-~~-'~'~', <br />j\l'---:;; <br />'\ <br /> <br />. <br /> <br />G) STORAGE AUAKE ESTES ~SMISSlON-TO AIDlPGRAll= <br />ED W ATE& TREATMENf PLANI 0., . .' <br /> <br />New Pump Station---:---------------------..---...----------------------------~$145 000 <br />. .... , <br /> <br />Pipeline to Existing Water Treatment Plant-------------------------$3,325,000 <br /> <br /> <br /> <br />Surge Tantc --------------------.--------------------------~--------~-----------$80, 000 <br /> <br /> <br /> <br />ExpandWTP with a 2nd Train-----~---_:-------------------------~-------$205,000 <br />Pump Station' Land . Acquisition~..------..---------------_:_---~----.;.-----$ 75, OOQ <br /> <br />TOTAL-:$3,830,OOQ <br /> <br /> <br />. .' <br />H) STORAGE AT PINEWOODLAKE AND TRANS.MISSION TO AN UP: <br />GRADED WATER TREATMENT PLANT <br /> <br />, . <br /> <br />New Pump Station--------------------------------------------------------~$145, 000 <br />~ipeline to Existing Wa~er Treatment Plant---------------..-------$2,325,OOO <br /> <br /> <br /> <br />Surge Tank ---------:-----------:-----------------..---------------;.---------~--..$8 0, 000 <br /> <br /> <br />Expand WTP with a 2hd Train-----------------------------------------$20S,000 <br /> <br />o , <br /> <br />Land Acquisition-.--------------------------------------------------------SJ. 020, 000 <br /> <br />TIrrAId3.775,OO!l <br /> <br />Both Alternates "G". and "H" above include extensive transmiSsion lines tra- <br />o versing both private and public lands, but confmnation of the availability of <br />such routes was outside the scope of the Planning Document. The estimated <br />cost magnitude of eaCh, however, has caUsed the District to dismiss them as <br />being viable options. <br /> <br />. - . . <br /> <br />2)N on-construction and . Other Proiects <br /> <br />As noted, engineering costs have been included in the above estimates for each <br />Alternate as part ora 25% contingency, and estimated land acquisition costs <br />were also identified with each, as appropriate. <br /> <br />26 <br />