Laserfiche WebLink
<br />. <br /> <br />. (C7', <br />. <br /> <br />.. <br /> <br />C) CROW LANE..#2 -20' lllQH DAM ' <br />. New Pump Station -------~-----..:-..--~~-------------------------------------$85,000 <br />Relocate Existing Pump Station (La Chaumiere)---..:-----------..-----$20,OOO <br />Pipeline to Re.servon:-~----------------..-----..-~~--------------_-~---~-----$4.70,90'O " <br /> <br /> <br />Surge Tank ------------------------~---------:.----------..-------~..-.;-----------$80,.000 <br /> <br /> <br />Expand WTP with 2nd Train------------------:.--------------------..-----$20S,Oo.0 <br /> <br /> <br />Extend. Three Phase Power to. WTP--------_---------~--------------------$2S ,0.0.0 <br /> <br /> <br />Control Valve at WTP--.-----------------------------------------------------$5,000., <br /> <br /> <br />Earthwork/Dam .------------------..-----..----------------------------------$425,0.0.0 <br /> <br /> <br />LaD.~ Acquisition------..:-----~-----------------------------~---------------.$ 335.0.00- <br /> <br />TOTAkll.650.0QG <br /> <br /> <br />( 8. acre/foot reservoir capacity-$206,200 per acre/foot) <br /> <br />24 <br />