My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000384
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:23:36 AM
Creation date
3/26/2007 10:33:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150180
Contractor Name
Pinewood Springs Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,~ <br /> <br />i <br /> <br />. <br /> <br />In addition to evaluating alternates to ensure a continuous supply of raw water, <br />a major premise of the Planning Document was to upgrade the existing water <br />treatment plant capacity to be able to meet the demands of the ~ulilinate devel- <br />opment of the earlier mentioned 350 EQR established by the Augmentation <br />Plan. The selected alternate will therefore also include~an upgrade of the exist- <br />ing treatment capacity to serve such ultimate develpment. <br /> <br />At their meeting on July 23, 2003,th~ District Board unaq.imously chose what <br />is termed in the Planning Document as the" Crow lane # 1,35' high dam" al- ) <br />ternate as the preferred plan. 'This will include a raw water reservoir, a raw wa- ,,~\ r <br />ter fill and draw transmission system between the the River and the reservoir, ~\ ~ <br />and the above mentioned upgrade in water treatment capacity. Also included <br />will be a re-routing of a segment of the existing treated water distribution sys- '\. <br />tern to get it out from under the site of the proposed reservoir, as well as a <br />rehabilitation of that segment of the existing treated water distribution system. <br />which parallels the proposed route of the above mentioned fill and draw sys- <br />tem. . <br /> <br />All of the designs developed for the alternates evaluated in the Planning Docu- <br />ment are of a preliminary conceptual nature for comparison purposes, and are <br />subject to refmement during more specific design efforts. <br /> <br />It is the purpose of this Preliminary Engineering Report to describe the Dis- f " vV I II <br />. trict's present situation, analyse the alternatives and the basis for choosing the o~ (L. <br />"Crow Lane # 1,35 ' high dam alternate, and propose.the action to be taken to ,iA <br />accomplish its construction. The format used will be an engineering commen- . <br />tary by Frank L. Novak, P.E., an employee of the District, referring to the Plan- <br />ning Document prepared by McLaughlin Water Engineers, and consistent with <br />the outline presented in RUS Bulletin 17~O-2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.