C150062 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150062 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:04:48 AM
Creation date
3/26/2007 10:33:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150062
Contractor Name
Monument, Town of
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
SB 01-157
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. :'I:~, ;;f,:~-: <br /> <br />PROJECT SUMMARY <br /> <br />. <br /> <br />Rehabilitation of Monument Lake Dam <br />Town of Monument <br /> <br />Proiect: Rehabilitation of Monument Lake Dam <br /> <br />Proiect Soonsor: Town of Monument <br /> <br />Amount of Loan Requested: $2,081,000 from the Perpetual Base Account of the <br />Severance Tax Trust Fund <br /> <br />TVDe of Proiect: Recreational, rehabilitation of an existing dam <br /> <br />Location: In the Town of Monument " <br /> <br />. <br /> <br />Proiect Description: The project involves rehabilitation of the spillway, the outlet works <br />and the dam embankment to include: (1) replacement of the existing spillway chute <br />below the spillway crest, (2) removal and replacement of the top 10 feet of the dam <br />embankment to clear all vegetation and installing an internal drainage system in the :. <br />embankment, and (3) replacement of the existing outlet works with a new 24-inch steel <br />pipe placed on bedrock below the embankment. The" Town also proposes to remove about <br />150,000 cubic yards of sediment from the bottom of the reservoir by dredging. <br /> <br />Schedule: Phase 1, which involves the spillway work, begins in February 2001 and ends <br />in May 2001. Phase 2, the embankment and outlet works, will begin in September of <br />2001 and be c()mpleted in March 2002. <br /> <br />Total Estimated Proiect Cost: $3,081,000 <br /> <br />Monument Reservoir Location Map <br /> <br />