Laserfiche WebLink
<br />.~ <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, <::olorado 80203 <br />Phone; (303) 866-3441 <br />FAX; (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br />STATE OF COLORADO <br /> <br />Q <br /> <br />September 28, 200 1 <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />(WeB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Mr. Robert D. Polich <br />Administrator <br />East Dillon Water District <br />P.O. Box 627 <br />Frisco, Colorado 80443 <br /> <br />Re: Application for Water Rights Loan <br /> <br />Dear Bob: <br /> <br />Enclosed, per our recent telephone conversation, is a copy of the Guidelines describing the <br />Colorado Water Conservation Board water proj ect funding programs and the requirements for <br />planning studies conducted under the loan. programs. <br /> <br />A feasibility study addressing the financial, technical and institutional feasibility of a proposed <br />project is required for any funding request from the CWCB. The study will generally address the <br />following items: <br /> <br />. A description of the need for lmd purpose of the project, <br /> <br />o A description of the project sponsor to include the type of entity, service area and customer <br />base, <br /> <br />o A detailed description of the water rights proposed for purchase to include an analysis of <br />yields and an appraisal of the market value of the right or rights, <br /> <br />o A description of project impacts and permitting requirements, <br /> <br />o A financial plan to describe the sources of financing for the project and the project sponsor's <br />ability to repay all existing and projected debt service, and <br /> <br />o A summary of the institutional considerations (permits, contracts, court actions, etc.) <br />required for project implementation. <br /> <br />Much of this information may already be available in your files or with your consultants. I will <br />try to provide you with as much assistance as time allows in the next few weeks. <br /> <br />Flood Protection · Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />