My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000379
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000379
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:54:01 PM
Creation date
3/26/2007 10:32:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150100
Contractor Name
East Dillon Water District
Contract Type
Loan
Water District
5
County
Summit
Bill Number
Bill 02-1152
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ST A TE OF COLORADO <br /> <br />Colorado Waier Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />May 16,2002 <br /> <br />Bill Owens <br />Governor <br /> <br />Mr. Robert D. Polich <br />Administrator <br />East Dillon Water District <br />P.O. Box 627 <br />Frisco, Colorado 80443 <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />RE: Final Acceptance of Feasibility Study <br /> <br />Dear Mr. Polich: <br /> <br />I have reviewed the Final Feasibility Study (April 22, 2002) and found that all items requested in our <br />letter of March 20, 2002 have been addressed and incorporated into the report. The purpose of this <br />letter is to notify you of CWCB final acceptance of the Feasibility Study. <br /> <br />The next step in our process is to obtain a signed Loan Contract between the District and the State of <br />Colorado. An approved contract must be in place before loan funds can be advanced. J an lllian, <br />CWCB Contract Administrator, will be contacting you in the near future to initiate the loan contract <br />process. For future reference, Jan's phone nYHlber is 303-866-3462. Based on your input we are <br />using July 1,2002 as the date the District will need to be able to obtain CWCB loan funds. <br /> <br />I have enjoyed working with you on this project and we look forward to our continued involvement. <br />If you have any questions, please don't hesitate to call me at 303-866-3428. <br /> <br />Sincerely, <br /> <br />0Y~1 <br /> <br /> <br />Bruce L. Johns , .E. <br />Water Supply Planning and Finance Section <br /> <br />cc: Mike Serlet, CWCB <br />Jan lllian, CWCB <br />Anne Janicki, CWCB <br />Charles E. Stanzione, Bishop-Brogden Associates, Inc. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.