My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150125 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150125 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 10:14:07 AM
Creation date
3/26/2007 10:31:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150125
Contractor Name
Surface Creek Ditch & Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Cost Estimate <br /> <br />The total project cost is estimated to be: <br /> <br />TOTAL <br /> <br />$ 241,500 <br />87,000 <br />35.000 <br />$ 363,500 <br /> <br />1. <br />2. <br />3. <br /> <br />Construction Cost <br />Engineering Design/Inspection and Testing <br />Project Contingency <br /> <br />Imnlementation Schedule <br /> <br />Work has been progressing on the dam this Fall. At present the core ofthe dam is mostly <br />reconstructed, but work is most likely over for the season due to snow, and will resume in <br />Spring 2003. . <br /> <br />Institutional Considerations <br /> <br />Entities that are, or may be, involved in the management, design, construction, and <br />financing of the project include: <br /> <br />Colorado W~ter Conservation Board (CWCB) - Financing and construction. <br />Delta County <br />U.S. Forest Service <br /> <br />Financial Analvsis <br /> <br />The total estimated cost ofthe project is $365,500 and SCD & RC water is used primarily <br />for agricultural purposes, with 6% municipal ownership (low-income.) The loan request <br />is for a 30-year maximum amount of$265,000 (approximately 73% of estimated project <br />cost) for 30 years at an interest rate of2.80%. <br /> <br />Table 1 is a summary of the financial aspects of the project. A CWCB Small Project <br />Loan of $265,000 would have an annual payment of $14,490 (including the 10% reserve <br />requirement) at the loan terms of2.80% for 30 years. This represents an annual loan <br />cost of$33.23 per acre-foot, based on an average annual delivery of 436 acre-feet. <br /> <br />Table 1. Financial Summary <br /> <br />Project Cost $363,500 <br />Number of Shareholders 255 <br />Number of Shares of Stock 810 <br />CWCB Loan Amount (30 years) $265,000 <br />CWCB Loan Payment (includes 10% reserve) $14,490 <br />Current Assessment per share (2002) $70 <br />New Assessments per share $70 <br />Annual Loan Cost per acre-foot (aver. Annual delivery: 436 ac-ft.) $33.23 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.