Laserfiche WebLink
<br />FROM ': .tGRi=lND MESi=I Wi=lTER USERS <br /> <br />mx NO. <br /> <br />9708562588 <br /> <br />Nov. 07 2002 01:22PM Pi <br /> <br />TABLE A <br /> <br />11/1/2002 <br /> <br />HOTEL LAKE DAM IMPROVEMENTS <br />UPDATED OPINION OF PROBABLE COSTS <br /> <br />Road <br />~ \,,,p )"" c.-- ~ Construction <br /> <br />Item Quantltv Unit Unit Cost Total Item SCD&RC <br />1, Excavate, condition and 3400 CY $3.00 $10,200.00 $7,650.00 $2,550,00 <br />stockpile borrow material <br />2, Piping Void <br />Excav'2lte and ~tockpilel~move 1350 CY $3.00 $4,050.00 $0.00 $4,050.00 <br />Reconstruct embankment 1350 GY $7.00 $9,450.00 $0.00 $9,450.00 <br />Import dry material 500 CY $18.00 $9,000.00 $0,00 $9,000,00 <br />3, 1960 Loose Fill <br />Excavate and stockpile 1450 CY $3,00 S4,350.00 $4,350,00 $0.00 <br />Reconstuct embankment 1450 CY $4,00 $5,800.00 $5,800.00 $0,00 <br />4. Construct additional 2100 CY $4.00 58,400.00 $8,400.00 $0.00 <br />compaded embankment <br />5. Remove and replace 36 inch 150 FT $75.00 $11,250,00 $3,000.00 $8,250,00 <br />spill.....-ay pipe and outfall <br />6. SpillwaY inlet structure 1 EA $5,000,00 $5,000,00 $0,00 $5,000.00 <br />wig rate <br />7. Excavate and replace 40 CY $25.00 $1,000.00 $0.00 $1,000.00 <br />depreSSion on upstream <br />. embankment <br />6, Seepage drain collection pipe 205 FT 520.00 $4,100.00 $0,00 $4,100.00 <br />9. Seepage drain solid pipe 135 FT $6.00 $810.00 $240,00 $570,00 <br />10. Seepage Chimney/Blanket Drain 690 I Cy $50.00 $34,500,00 $11,500.00 $23,000.00 <br />11. EXtend Outlet Pipe wi structure 1 LS $5,000.00 $5.000,00 $5.000,00 $0.00 <br />12. Movement Instrumentation 1 lS $3,500.00 $3,500.00 so 001 $3,500.00 <br />13. Piezometers 6 EA $750.00 $4,500,00 $0,00 $4,500.00 <br />14. Road Base 380 TON $30.00 $11,400,00 $11,400.00 $0.00 <br />15. Power Pole Reloca:lion 1 LS $1,500,00 $1,500.00 $1,500,00 $0.00 <br /> I <br /> <br />Resource Engineering, Inc, <br /> <br />cosaOO2A,xls <br /> <br />Page 1 <br />