<br />TABLE A
<br />
<br />11/1/2002
<br />
<br />HOTEL LAKE DAM IMPROVEMENTS
<br />UPDATED OPINION OF PROBABLE COSTS
<br />
<br />Road
<br />~ \,,,p )"" c.-- ~ Construction
<br />
<br />Item Quantltv Unit Unit Cost Total Item SCD&RC
<br />1, Excavate, condition and 3400 CY $3.00 $10,200.00 $7,650.00 $2,550,00
<br />stockpile borrow material
<br />2, Piping Void
<br />Excav'2lte and ~tockpilel~move 1350 CY $3.00 $4,050.00 $0.00 $4,050.00
<br />Reconstruct embankment 1350 GY $7.00 $9,450.00 $0.00 $9,450.00
<br />Import dry material 500 CY $18.00 $9,000.00 $0,00 $9,000,00
<br />3, 1960 Loose Fill
<br />Excavate and stockpile 1450 CY $3,00 S4,350.00 $4,350,00 $0.00
<br />Reconstuct embankment 1450 CY $4,00 $5,800.00 $5,800.00 $0,00
<br />4. Construct additional 2100 CY $4.00 58,400.00 $8,400.00 $0.00
<br />compaded embankment
<br />5. Remove and replace 36 inch 150 FT $75.00 $11,250,00 $3,000.00 $8,250,00
<br />spill.....-ay pipe and outfall
<br />6. SpillwaY inlet structure 1 EA $5,000,00 $5,000,00 $0,00 $5,000.00
<br />wig rate
<br />7. Excavate and replace 40 CY $25.00 $1,000.00 $0.00 $1,000.00
<br />depreSSion on upstream
<br />. embankment
<br />6, Seepage drain collection pipe 205 FT 520.00 $4,100.00 $0,00 $4,100.00
<br />9. Seepage drain solid pipe 135 FT $6.00 $810.00 $240,00 $570,00
<br />10. Seepage Chimney/Blanket Drain 690 I Cy $50.00 $34,500,00 $11,500.00 $23,000.00
<br />11. EXtend Outlet Pipe wi structure 1 LS $5,000.00 $5.000,00 $5.000,00 $0.00
<br />12. Movement Instrumentation 1 lS $3,500.00 $3,500.00 so 001 $3,500.00
<br />13. Piezometers 6 EA $750.00 $4,500,00 $0,00 $4,500.00
<br />14. Road Base 380 TON $30.00 $11,400,00 $11,400.00 $0.00
<br />15. Power Pole Reloca:lion 1 LS $1,500,00 $1,500.00 $1,500,00 $0.00