<br />11/1/2002
<br />
<br />IROVEMENTS
<br />~OBABLE COSTS
<br />TASKS
<br />
<br />Road
<br />Construction
<br />
<br />Item Quantity' Unit Unit Cost Total Item SCD&RC
<br />1, Excavate, condition and 3400 CY $3.00 $10.200.00 $7,650.00 $2,550,00
<br />stockpile oorrow material
<br /> Remaining 1700 Cy $3.00 $5,100.00 $3,825.00 $1,215.00
<br />2, Piping Void
<br />Excavate and stockpilefremove 1350 CY $3.00 $4,050,00 $0.00 $4,050.00
<br /> Remaining 0 Cy .3,00 $0.00 $0.00 $0.00
<br />Reconstruct embankment 1350 CY $7.00 $9.450,00 $0.00 $9,450,00
<br /> Rom;;.lning 170 CY $7,00 $1,180,00 $0,00 $1,190.00
<br />Import dry material 500 CY $18,00 $9,000.00 $0,00 $9,000.00
<br /> Remaining 0 CY $18.00 $0,00 $0,00 $0.00
<br />3. 1960 Loose Fill
<br />Excavate and stockpile 1450 CY $3,00 $4,350.00 $4,350,00 $0,00
<br /> RemaInIng 0 CV $3.00 $0.00 $0.00 '0,00
<br />Reconstuct embankment 1450 CY $4.00 $5,600,00 $5,800,00 $0,00
<br /> Remaining 1450 c:f $4,00 $5,800.00 $5,800.00 $0_00
<br />4. Construct additio~[ 2100 CY $4,00 $2,.400.00 $8,400.00 so.oo
<br />compacted embankment
<br /> Remaining 2100 CY $4,00 $8,400.00 $8,400.00 $0,00
<br />5, Remove and replace 36 inch 150 FT $75,00 511,250,00 $3,000,00 $8,250,00
<br />spillway pipe and outfall
<br /> Remaining 150 FT 175.00 $11,250.00 $3,000,00 $8,250.00
<br />6. Spillway inlet structure 1 EA $5,000.00 $0,000,00 SO.OO $5,000.00
<br />wfgrete
<br /> Remaining 1 EA $5,000.00 $5,000,00 $0.00 $5,000.00
<br />7. Excavate and repiace 40 CY $20.00 $1,000_00 $0,00 $1,000,00
<br />depression on upstream
<br />embankment
<br /> Remaining 40 Cy $25.00 $1,000.00 SO.OO $1,000.00
<br />8. Seepage drain collection pipe 205 FT $20.00 $4,100.00 $0.00 $4,100.00
<br /> Remaining 205 FT ~O_OO $4,100.00 $0_00 $4,100_00
<br />9. Seepage drain solid pipe 135 FT $6,00 $810,00 $240,00 $570,00
<br /> Remaining 135 FT $6.00 1910,00 $240.00 $570.00
<br />
<br />Resource Engineering, Inc.
<br />
<br />cost2002B,xls
<br />
<br />Page 1