Laserfiche WebLink
<br />CWCB Construction Fund Loan Application <br /> <br />is the Surface Creek, Ward Creek, Kiser Creek and Tongue Creek drainage area. About 6000 <br /> <br />acres. <br /> <br />Water Right: 218 CFS.1907 decree, 1936 decree Average water diverted per year: 436 acre-feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES _ NO X <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s), <br />NAME ADDRESS :md PHONE <br /> <br />Resource Engineering <br />Clay & Dodson, P.C. <br /> <br />909 Colorado Ave. Glenwood Springs CO 81601 (970) 945-6777 <br />P.O. Box 38, Delta, CO 81416 (970) 874-9777 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. none <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br />Estimated Total Costs: <br /> <br />$ 54,706 <br /> <br />$ 225,326. <br /> <br />$ 280,032. <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ 215,000.00 (Usually 75% of Estimated Total Costs) <br /> <br />Term (length) ofloan: <br />Interest Rate: <br /> <br />30 y~3r~ <br />.0275~ <br /> <br />(Usually 10,20, or 30 years) <br /> <br />(please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br /> <br />1 <br /> <br />CFLA602 <br />