My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150125 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150125 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 10:14:07 AM
Creation date
3/26/2007 10:31:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150125
Contractor Name
Surface Creek Ditch & Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />is the Surface Creek, Ward Creek, Kiser Creek and Tongue Creek drainage area. About 6000 <br /> <br />acres. <br /> <br />Water Right: 218 CFS.1907 decree, 1936 decree Average water diverted per year: 436 acre-feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES _ NO X <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s), <br />NAME ADDRESS :md PHONE <br /> <br />Resource Engineering <br />Clay & Dodson, P.C. <br /> <br />909 Colorado Ave. Glenwood Springs CO 81601 (970) 945-6777 <br />P.O. Box 38, Delta, CO 81416 (970) 874-9777 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. none <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br />Estimated Total Costs: <br /> <br />$ 54,706 <br /> <br />$ 225,326. <br /> <br />$ 280,032. <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ 215,000.00 (Usually 75% of Estimated Total Costs) <br /> <br />Term (length) ofloan: <br />Interest Rate: <br /> <br />30 y~3r~ <br />.0275~ <br /> <br />(Usually 10,20, or 30 years) <br /> <br />(please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br /> <br />1 <br /> <br />CFLA602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.