My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150081 Application
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150081 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2014 4:25:12 PM
Creation date
3/26/2007 10:31:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150081
Contractor Name
Victor, City of
Contract Type
Loan
Water District
12
County
Teller
Bill Number
HB 95-1155
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />',f , <br /> <br />cweB Construction Fund Loan Application <br />Revised January 31, 1994 <br /> <br />4. Is the organization incorporated in the State of Colorado? YES ~ NO <br />(If "YES", please include a copy of the articles of incorporation, and the Bylaws with this <br />application fonn.) <br /> <br />s. Please provide a brief description of the owner's existing water supply facilities and <br />describe any existing operational or maintenance problems. (Attach separate sheets and <br />a map. if needed.): <br />Earth fill dam built in 1890's. In 1984. lateral cracks in c.re~~ reported. <br /> <br />Spillway lowered bv 1.5 feet to c.omnly wit'h SFO TPq"Pc>r No work to <br /> <br />reoair ha~ hppn nnnp <br /> <br />6. <br /> <br />For existing facilities indicate: <br /> <br />(a) the number of shareholdelS . or <br />(b) the number of customelS served :i:500. <br /> <br />Part B. . Descripdon of the Project <br /> <br />l. <br /> <br />Name of the project or facility: <br /> <br />Victor f!2 Dam <br /> <br />2. What is the purpose of this loan application? Check one. <br /> <br />_ New project <br />~ Rehabilitation or replacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency Repair <br />_ Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under <br />a storage restriction order from the State Engineer? YES -!- NO - <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.