Laserfiche WebLink
<br />MAR-31-00 13:40 <br /> <br />From:CC&V GOLD MNG, <br /> <br />1 T.l 96893254 <br /> <br />T-156 <br /> <br />II nl/nl <br />I . w" . I <br /> <br />1..1o_1'~ <br />... I I W <br /> <br /> <br />1894.1994 <br /> <br />P.o. Box 86 <br />VICTOR CO 80860 <br />PHoNE: (71 9) 689-2284 <br />FAX: (719) 689-2703 <br /> <br />March 27, 2000 <br /> <br />Mr. Bill Green <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Co 80203 FAX: 303-866-4474 <br />RE: Bison Park Dam, Water Division 2, DAMID 120102 <br /> <br />RECEIVED <br />MAR 3 1 <br /> <br />Color.->u" , <br />(", '. ~ <br />, . JServaJ)c;n <br /> <br />Dear Mr. Green; <br /> <br />With the understanding that following an inspection of the City of Victor qam. and the completion of the feallibiliry <br />study as presented by Penn Gildersleeve of ICON Eniineering, work has proceeded on plans to begin the repair <br />work on the project. <br /> <br />To possibly supply some in-kind participation to meet part of the City Contribution, and perhaps require less total <br />loan amount, we are proceeding with the following plan (we understand tbe loan can be 75% - :ZS% inkind.): <br />· Phase I - Construction of Road (approximately ~ to 3/4 mile) to be competed SUmmer 2000. Our Wllter <br />Attorney, Sandy (M. E.) MacDougall has assisted in contacting Fort Carson to see if we might be able to obtain <br />some assistance: for this phase of the work. <br /> <br />· Ames Construction is in the process of reviewing the 1986 Feasibility Draft 88 well as the revisions mllde: in <br />1995 and 1999. We hope to possibly contract with them for engineering design work as well as future <br />construction needs. <br /> <br />· OUT water attorney. M. E. MacDoU2all has also suggested (memo of225 2000) that the capacity of Victor <br />Reservoir No.2 be increased at least 225 acre.feet to accommodate past water rights. We hope to accommodate <br />this suggestion as well. <br /> <br />· Following this initial phase. it may be necessary to place a project manager on board. <br /> <br />· At present, Ehe City of Victor has a water aareement with the Cripple Creek & Victor Gold Mining Company <br />for water uS<lae. We hope to have some assistance from them with the needed water valve and line. <br /> <br />To go further with the statement of plans, I need the following information~ Did you fmd it necesslUY to request <br />parity with me current Sewer Plant Loan? II the current submitted paper work acceptable: and do we meet the <br />needed criteria? If work is invoiced and paid step by step, is the interest applied as the payments are made'? Of do <br />we pay interest on the entire amount of the requeited grant? <br />At what stale do we need to complete the grant? Again I thanlc you for your assistanc~. <br /> <br />Sincere~ours, <br /> <br />'rJ ./).JQ-~ <br /> <br />Jim Watson. Mayor <br />City of Victor <br /> <br />~ "- - Q.(,~ fh ~ p-u - ~ <br /> <br />Cc: Sandy MacDouiaU, <br />Ames Construction <br />Tish Allen <br />Kirk Lamphier <br />