Laserfiche WebLink
<br />",'" <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />i) <br /> <br />Octo ber 5, 2000 <br /> <br />Bill Owens <br />Governor <br /> <br />Ms. Tish Allen, Councilwoman <br />City of Victor <br />P,O. Box 86 <br />Victor, Colorado 80860 <br /> <br />Greg E.Walcher <br />Executive Director <br /> <br />Peter H. Evans <br />CWCB Director <br /> <br />Re: Victor No.2 Dam Rehabilitation Project <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Dear Tish: <br /> <br />Per our telephone conversation today, there are a few remaining questions regarding the <br />Victor No.2 Dam Rehabilitation Project which we would like to be able to resolve before <br />Icon Engineering completes the feasibility study for the project and the Colorado Water <br />Conservation Board staff is able to make a final determination ofproject feasibility: <br /> <br />I. It is not entirely clear exactly what the proposed project includes in terms of reservoir <br />capacity and the amount by which the dam embankment and spillway will be raised. <br />Is $800,000 still an appropriate cost estimate for the work to be done? <br /> <br />2. Thank you for sending the schedule for the engineering design work. We would like <br />to request that the other major work tasks be included in a project implementation <br />schedule such as; upgrading the access road to the dam, acquisition of any required <br />permits (in addition to review of plans and specifications by the State Engineer's <br />Office), selection of a construction contractor and the dam and and reservoir <br />construction work. <br /> <br />3. We would like to suggest that you might want to allow more than one month for <br />review of plans and specifications by the State Engineer's Office. <br /> <br />4. It would be helpful to have some clarification on the sources of funds for the project <br />to include the grant from the Colorado Department of Local Affairs, the amount of <br />the City's financial participation in terms of cash or in-kind services and the <br />approximate amount which the City is intending to draw from the $600,000 <br />Construction Fund authorization. The total amount of project funding should <br />correspond with the cost estimate. <br /> <br />5. The financial section of the feasibility study should be revised to mention the water <br />activity enterprise to be established prior the time the City and the CWCB enter into a <br />loan contract and how the enterprise will resolve the 'issue of parity with the loan <br />