Laserfiche WebLink
<br />Water Right: <br />acre-feet. <br /> <br />CFS. <br /> <br />Average water diverted per year: <br /> <br />6. Will the acquisition of additional water rights be necessary? YES <br /> <br />No1 <br /> <br />If YES, please explain. _ <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attomey(s). <br /> <br />NAME <br />Ra..~ Q 11\....... (3('(l"-l l(.\.U" <br />tSf €.......;t N qj.{co/\.. <br /> <br />ADDRESS and PHONE <br />~I ~ S 3 A 5 t-o I,'^.i <br />--.!1 7 D - ~ 4 7 ,- Q fS'B' 3 <br /> <br />970 <br /> <br />52./ 0700 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are <br />now in progress for the proposed project. Please submit one copy of each completed <br />study with this application. - It -t~~~;hr I;t{f S1u~d ;~ ~ OIlLYl,-f):1 )'" <br /> <br />_ ptf6J'Je~3 <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and <br />estimated construction costs, if known. <br /> <br />Estimated Engineering Costs: $ ) ~ () 0 <br /> <br />Estimated Construction Costs: <br /> <br />Estimated Total Costs: <br /> <br />$-11.Pi C')O <::> <br />$~ 000 <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: <br /> <br />" 8 <br />9610 (\ -t 714,000 <br />$ J5; 'bO(Usually 75% of <br /> <br />Estimated Total Costs) <br /> <br />Term (length) ofloan: <br /> <br />3 D years (Usually 10, 20, <br /> <br />or 30 years) <br /> <br />Interest Rate: <br /> <br />2/ 75-% <br /> <br />(please call for <br /> <br />our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project <br />sponsor have the financial capacity to repay any loans made by the CWCB. The <br />following information is needed to assist the CWCB in a preliminary assessment of the <br />