Laserfiche WebLink
<br />Water Riqhts <br /> <br />The Toyne's currently have decrees on the 8 wells used for <br />irrigating their farm. These wells are augmented through GASP. <br />The proposed recharge well and the augmentation well will require <br />a new water right and is currently being sought. This new <br />recharge water right will be for a maximum of 7.8 cfs with an <br />average annual yield of 3500 acre feet. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $115,000. <br /> <br />Item <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />Total Cost <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />1. Drill Well (2 wells) <br />2. Well and Installation (2 wells) <br />3. 15" PVC Pipe (7600 linear feet) <br />4. Pipe Installation (7600 linear feet) <br />5. Electricity for wells (lump sum) <br />6. Dirt Work <br />7. Contingency <br />8. Planning and Design Costs <br /> <br />Total Cost <br /> <br />Imp1ementation Schedu1e <br /> <br />Estimated Cost <br /> <br />$ 2,000 <br />$113,000 <br /> <br />$115,000 <br /> <br />Estimated Cost <br /> <br />$ 18,000 <br />$ 30,000 <br />$ 41,800 <br />$ 11,400 <br />$ 4,000 <br />$ 1,500 <br />$ 6,300 <br />$ 2,000 <br /> <br />$115,000 <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />~Complete Final Design <br />2. Start Construction <br />3. Complete Construction <br />4. Project is Operational <br /> <br />Feasibility Study <br />Glenn Toyne <br />Recharge Project <br />February 2003 <br /> <br />8 <br /> <br />Date <br />03/31/03 <br />04/07/03 <br />04/18/03 <br />04/19/03 <br />