Laserfiche WebLink
<br />. <br /> <br />CWCB Construction Fund Loan Application <br />Revised January 31, 1994 <br /> <br />4. Is the organization incorporated in the State of Colorado? YES _ NO X <br />(If "YES", please include a copy of the articles of incorporation, and the Bylaws with this <br />application form). <br /> <br />5. Please provide a brief description of the owner's existing water supply facilities and describe <br />any existing operational or maintenance problems. (Attach separate sheets and a map, ifneeded.): <br />Deterioration at the reservoir. particularly a structuraUy - failed spillway and documented <br />excessive seeJ)age. have led to restrictions being imposed by the state engineers on tbe <br />storage capacity of the reservoir. No other potential maintenance problems exist. <br /> <br />6. For existing facilities indicate: (a) the number of shareholders 1 . or (City ofIdaho Sprinrs) <br />(b) the number of customers served : approximately <br />1DOO <br /> <br />Part B. - Description of the Project <br /> <br />1. Name of the project or facility: Idaho Springs Reservoir <br /> <br />2. What is the purpose of this loan application? Check one. <br /> <br />_ New Project <br />--X...Rehabilitation or replacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency Repair <br />_ Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a storage <br />restriction order from the State Engineer? YES --X- NO <br />17' 6"/120 Acre ft. <br /> <br />2 <br />